Laserfiche WebLink
PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Works epproved plan dated <br />5. Conne- side sewer per City Standard M60t. <br />�.� Connect side sewer per City Standard #'s 607, 602, 604. <br />7. Connect all rooftop downspouts to the siue sewer. <br />8. ) Connect rooftop downspouts to the drainage system provided for this lot. <br />9. Rooftop runoH must be discharged to a roof downspout infiltration system per City of Everett <br />Storm Manual 3-2.6.2. Widih _, Depth _, Length _. <br />10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br />routing prior to beginning the project. <br />11 Install srosion conirol measures as determined by the Public Works insper ,ur, auch as silt <br />fence, straw bales, swales, or erosion blankets. <br />12. Install eros(on conirol measures per City of Everett Standards for small percels <br />�3)Fiemove ero�ion control measures upon completion ol the project prior to finel approvel of the <br />permit. <br />14iAll excavated material from foundation, sidewalk and driveways shall be hauled to an <br />epproved, permitled site. No wasting of material is allowed on this building lot. <br />15. Remove end replace curb, gutter end sidewalk as per Ciy o} Everett Standard Plan #'s 305A <br />& 306 on this proposal's frontage es directed by the Public WorAs Inspector (i.e. all unused <br />driveways and any broken or dameged urea muet be replaced). <br />16. Instell a Type I concrete driveway per City of Everett Standard �t307. <br />;�� <br />�7JPave driveway from the front property Iina out to ihe street peving. <br />18. Contact the Water District for connecting provisions for this building's <br />weter and sewer services. <br />19. A catch basin as per City Stendard Plen 1t402 with a ges trap per Standerd Plen N410's <br />required for the parking eree. <br />20. If a sewer pump system is to be installed, the pressure line must discherge into a private <br />manhole, then grevity ilow across the publir �ight-of-wey. <br />21. A sprir�kler system is required for this building in compliance wi!h the requirements of NFDA <br />Standards 13D. <br />PWComments <br />