Laserfiche WebLink
PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved plan dated _ <br />5. Connect side sewer per City Standard #601. <br />� <br />, (�B. J Connect side sewer per Ciry Standard �t's 601, 602, 604. <br />�_i <br />7. Connect all rooftop downspouts to the side sewer. <br />�� 8„ Connect rooftop downspouts to the drainage system provided for this lot. <br />9. Rooftop runoN must be discharged to a roof downspout infiltration sys�em per City of Evarett <br />Storm Manual 3-2.6.2. Width ___, Depth _, Length _. <br />10. The contractor must meel with thP Public Works Inspector to discuss potentiai drainsge <br />routing prior to beginning the project. <br />1 t. Install erosion control measures as determined by the Public Works inspector, such as silt <br />tence, straw bales, swales, or erosion blankets. <br />12. Instail erosion control measures per City of Everett Standards for small parcels <br />13. Femove erosion control measurec upon compietion o( the projRct prior to final approval of the <br />permit. <br />��14. All excavated material from foundation, sidewalk and driveway� shall be hauled to an <br />- approved, permitted site. No wasting of material is allowed on this building lot. <br />15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br />& 306 on this proposal's trontage as directed by ihe Public �Norks Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />16. Install a Type I concrete driveway per Gry cf Everett Standard p307. <br />17. Pave driveway irom ihe front proper'y line out to ihe street paving. <br />18. Contact the __ _ Water District for connecting provisions for this building's <br />water and sewer seivices. <br />19. A catch basin as per City Standaid Flan �r402 with a gas trap per Standard Plan #410 is <br />required for the parking area. <br />20. If a sewe� pump system �s to be instalied, the pressure line must discharge into a private <br />manhole, then gravity flow across the public right-of-way. <br />21 . A sprinkler system is required for this buildmg in compliance with �he requirements oi NFDA <br />Standards 13D. <br />