Laserfiche WebLink
� <br />PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved plan dated <br />5. Connect side sewer per City Stai idard #601. <br />�, Gonnect side sewer per City Standard #'s 601, 602, 604. <br />7. Connect all rooftop downspouts to the side sewer. <br />�� Conrect rooftop down:,pouts to the drainage system provided for this lot. <br />9. Rooftop runoff must be discharged to a roof downspout intiltration system per Ciry ot Everett <br />Storm Manual 3-2.62. Width _, Depth _, Length _. <br />10. The contractor must meet with the Public Works Inspector to discuss potential dreinage <br />routing prior to beginning the project. <br />11. Install arosion control measures as determined by the Public Works inspector, such ea silt <br />fence, straw bales, swales, or erosion blankets. <br />12. Install erosion control measures per Ciry of Everett Standerds for small parcels <br />13. Remove erosion control measures upon completion of the project prlor to final epproval of the <br />permit. <br />7 4. II excavated material irom foundatfon, sidewalk and drivoways shall be hauled to an <br />pproved, permitted site. No wasting of material is allowed on this building lot. <br />15. Remove end replace c�rb, gutter and sidewalk as per City of Everett Standard Plan N's 305A <br />� 306 on ihis proposal's irontage as directed by the Public Works Inspector (i.e. all unused <br />driveways end any broken or damaged aree must be replaced). <br />16. Install a Typ> I concrete driveway per City of Everett Standard #307. <br />17. Pave driveway from the front propery line out to ihe street paving. <br />18. Contact the _. _ Wacer District for connecHng provisions for this build�ng's <br />water and sewer services. <br />19. A caich basin as per Ciry Standard Plan #402 with a gas trap per Standard Plan It410 Is <br />required for the perking erea. <br />20. I( a sewer pum�, system is to be installed, the pressure line must discharge into a private <br />manhole, th��i gravity tlow ecross the public right-of-way. <br />21. A sprinkler system is required for this building in compliance with the requiremenis of tvFDA <br />Standards 13D. <br />PWCOmrMf�tS <br />z/Z <br />