My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2616 97TH PL SE 2016-01-01 MF Import
>
Address Records
>
97TH PL SE
>
2616
>
2616 97TH PL SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 9:29:44 PM
Creation date
4/14/2017 1:20:47 PM
Metadata
Fields
Template:
Address Document
Street Name
97TH PL SE
Street Number
2616
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT C�MMENTS <br />4. As per Public Works approved plan dated <br />5. Connect side sewer per Ciry Standard #601. <br />� Connect side sewer per City Standard #'s 601, 602, 604. <br />7. Connect all rooftop downspouts to the side sewer. <br />LB�Connect roofrop do•Nnspouts to the drainage system provided for this lot. <br />9. Rooftop runotf must be discharged to a roof downspout infiltration system per City of Everett <br />Storm Manual 3-2.6.2. Width _, Depth _, Length _. <br />10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br />routing prior to beginning the project. <br />1 1. Install erosion control measures as determined by the Public Works inspector, such as silt <br />fence, straw bales, swale5, or erosion alankets. <br />12. I�stall erosion control measures per City of Everett Standards for small parcels <br />13. Hemove erosion control measures upon comp�^!ion of the project prior to final ap�roval of the <br />permit. <br />� 4, All excavated material from (oundation, sidewalk and driveways shall be haul��d :o an <br />approved, permitted site. No wasting of materiaf is aliowed on this buildina lot. <br />15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br />8 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />16. Install a Type I concrete driveway per City of Everen Standard #307. <br />17. Pave driveway irom the iront property line out to the street paving. <br />18. Contact the Water District for connecting provi�ions for this building's <br />water and sewer services. <br />19. A catch basin as per City Standerd Plan It402 with a gas trap per Standard Plan �410 is <br />required for the parking area. <br />20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br />manhole, then gravity (low across the public right•of-way. <br />21. A sprinkler system is required for this building in compliance with the requirements of NFDA <br />Standards 13D. <br />=Yrc:,n,an��;s Z/ <br />Z <br />
The URL can be used to link to this page
Your browser does not support the video tag.