Laserfiche WebLink
PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Work� approvad plan dated <br />5. Connect side sewer per City Standa�d #601. <br />6.;' Connect side sewer per Ciry Standard #'s 601, 602, 604. <br />7. Connect all rooftop downspouts to the side sewer. <br />8. Connect rooftop downspouts to the drainage system provided for this lot. <br />9. Rooftop runoft must be discharged to e roof downspout infiltration system per City ol Everett <br />Storm Manual 3-2.6.2. Width __, Depth _, Length _. <br />10. The contractor must meet with the Public Works Inspector to discuss poicntial dr^inage <br />routing prior to beginning the project. <br />i 1J. Install erosion control m, ssures �s determined by �I,? Pubiic Works inspector, such as silt <br />tence, straw bales, swales, or erosion blankets. <br />' 2. Install erosion control measures per City of Everett Standards for smali parcels <br />S 3; Remove erosion control measures upon completion of the project prior ?o final approval of the <br />permit. <br />14. All excavated material from foundation, sidewalk and driveways shall be hauled to an <br />approved, permittad site. No w3sting oi material is allowed on this building lot. <br />15. bemove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br />& 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br />driveways and any broken or dam3ged area mus; be replaced). <br />16. Install a Type I conr.rr;te driveway per City of Everett Standard #307. <br />17. Pave driveway from the front property line out tc 'tie street paving. <br />18. Contact the _ Water District ior connecting provisions for this building's <br />water and sewer services. <br />19. A catch basin as per City Standard Plan �402 with a gas trap per Staedard Plan k410 is <br />required for the parking area. <br />20. If a sewer pump system �s to be installed, the pressure line muet dischar�e into a pnvate <br />manhole, then gravity flow across the public right-of-way. <br />21. A sprinkler system is required for this building in compliance with the requirements oi NFDA <br />Standards 13D. <br />PWComnenis <br />