Laserfiche WebLink
4. <br />5. <br />f✓' <br />�8; <br />PUBLIC WORKS PERMIT COMMENTS <br />As per Public Works approved plan dated — <br />Connect side sewer per City Standard #601. <br />Connect side sewer per City Standard #'s 601, 602, 604. <br />Connect all roo(lop downspouts to the side sewer <br />Connect rooftop downspouls to lhe drainage system provi�ed !or this lot. <br />Rooftop runoff rc discharged to a roof downspout infiltration system per City of Everett <br />Storm Manual 3-2.�._. The approximale size ircnch is 'i.5' wide, 2' deep and 25' long. See <br />attachment tor more details. <br />The contractor mvst meet with the Public Works Inspector to discuss potential dra�nage <br />routing prior to beginning lhe project. <br />Install erosion control measures as determined by lhe Public Works inspector, such as sill <br />fence, slraw bales, swales, or erosion blankets. <br />Install erosion control measures per City o( Everett Stand2ird5 tor small parcels <br />Remove erosion controi measures upon completion o� lhe project prior to final aoproval of the <br />permit. <br />All excavated material (rom fowidation, sidewalk and driveways shall be h2uled to an <br />approved, permilted site. No wasling o( material is allowed on this building lot. <br />15. Remove and replace curb, gutter and sidewalk as per City of Everett Standar�i Plan #'s 305A <br />& 306 on this proposal's irontage as directed by lhe Public Works Inspector (i.e. all w��sed <br />driveways and any broken or damaged area musl be replaced). <br />16. <br />17 <br />Install a Type I concrele drivew,ay per City of Everett Standard #307. <br />Pave driveway �r�m the front property line out to the street paving. <br />18. Contact the _ Water District for connectin� provisions (or this building's <br />water and sewer services. <br />,? <br />20. <br />L� <br />A catch basin as pFlr City Standard Plan #402 with a gas trap per Standard Plan #410 is <br />required for the parking area. <br />Ii a sewer pump syst2m is to be instafled, the pressure lino must discharge into a private <br />manhole, then gra�ity flow across the public right-of-way. <br />A sprinkl.;r aystem is required for this building in compliance with the reyuirements of NFDA <br />Staiidards 3G. <br />Frrc�„me���s Z �' <br />�L <br />