My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1815 98TH PL SW 2016-01-01 MF Import
>
Address Records
>
98TH PL SW
>
1815
>
1815 98TH PL SW 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 8:46:16 PM
Creation date
4/14/2017 1:47:56 PM
Metadata
Fields
Template:
Address Document
Street Name
98TH PL SW
Street Number
1815
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMMENTS <br />4 Connect side sewer per City Standard JtG01 <br />5 Connect side sewer per City Standard #'s 601, 602, 604 <br />6 Connect all roottop downspouts to the sid.. sewer <br />7 Connect rooftop downspouts to the drainage system provided tor th�s Ict <br />8 r2ooRop runoH musl be discharged to a root downspout inCdtration system per Gty ot EvereC Storm <br />Manual 3-2 6 2 The approximate size trench is 3 5' wide 2' deep and 25' long See atlachmenl for <br />more delails <br />9 The contractor musl meel with the PubGc Works Inspeclor to discuss polential drainage routing ;,rwr to <br />beginnmg the project Call Randv AIIen at 425-339-7403 // Call CIiH Lmdman at 425-3J9-7404 <br />�'0 Install erosion control measures as determined by the Publlc Works inspector, such as silt fence, straw <br />bales, swales, or erosion blankets <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />Inslall erosion conirol measures per City of Evere't Slandards lor small parcels <br />Remove erosion control measures upon completion ot the project prior to fina� appr�val of the permd <br />All excavated material irom foundation, sidewalk and dr�veways shall be hauled to an approved permitted <br />site. No washng of material is allowed on thls bwlding lot <br />No d�rt, mud, rocks or debris to be tracked onto roadway <br />No building materials to be s�acked on sidewalk/roadway and sidewalk/roadway to be kepl clean and <br />open for pedestrian travel <br />Adjust water meter boz t" above sidewalk grade <br />17 Remove end replace curb, gutler and sidewalk as per Cily of Everett Standa�d Plan N's 305A 8 306 on <br />this proposal's frontage as directed by the Pubfic Works Inspector (i e all unused driveways and any <br />broken or damaged area must be replaced) <br />18 <br />. "19� <br />� <br />20 <br />21 <br />22 <br />23 <br />24 <br />Install a Type I concrete driveway per City of Everett Standard #307 <br />Pave driveway irom the front property line out to the street paving <br />Pave to exlsling paving in alley <br />/ �r/ j'-V� <br />Cont3ct the /(,(�lli /rrd Waler DistriG for connecting provisions for �his budding's�— <br />sewer services <br />A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan #410 is required for the <br />parking area <br />If a sewer pump system is to be installed, the pressure Gne must discharge into a private manhole, then <br />gravity Flow across the public right-o6way. <br />A spnnkler system is reqwred for this buildmg in compliance with lhe requirements of NFPA Standards <br />13D <br />Your PubGc Works Inspector is Clifi Lindman Call him at 425-339-7404 tor questions and inspections <br />, ,, ,, � . u..,�,,,,, �, d „ ��L <br />
The URL can be used to link to this page
Your browser does not support the video tag.