My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1805 100TH ST SW A 2016-01-01 MF Import
>
Address Records
>
100TH ST SW
>
1805
>
1805 100TH ST SW A 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2017 2:48:24 PM
Creation date
4/14/2017 2:48:16 PM
Metadata
Fields
Template:
Address Document
Street Name
100TH ST SW
Street Number
1805
Unit
A
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC 1NORK5 PERMIT COMMENTS <br /> 4. As per Public Works approved plan dated <br /> 5. Connecl side sewer per City Slandard #601. <br /> 6. Connect side sewer per Ciry Standard#'s 601, 602, 604. <br /> 7. Connect all roo(top downspouts to the side sewer. <br /> 8. Connect rooftop downspouts to ihe drainage system provided for this lot. <br /> 9. Rooftop runoff must be discharged to a roo(downspout in(iltration sys'em per City of Everett <br /> Storm Manual 3-2.6.2. The approximate size trench is 3.5'wide, 2' deep and 25' long. See <br /> attachmenl for more details. <br /> 10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> routing prior to beginning the project. <br /> 11. Install erosion control measures as determined by the Pubiic Works inspector, such as silt <br /> fence, straw bales, swales, or erosion blankets. <br /> � j 12. Install erosion control measures per City of Everett Standards (or small parcels <br /> '- 13. Remove erosion control measures upon completion of Ihe project prior to final approval of the � <br /> permit. <br /> 14. All excavated ma�erial from foundation, sidewalk and driveways shall be hauled to an <br /> approved, perm�tted site. No wasting uf material is allowed on this building lot. <br /> 15. Remova and repiace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br /> 8 306 on this proposal's frontage as directed by the Public Works Inspector(i.e. all unused <br /> driveways and any broken or damaged area must be repisced). <br /> 16. Install a Type I concrete driveway per City o( Everett Standard #307. <br /> 17. Pave driveway from the front property line oul to the street paving. <br /> � �il Contact the /7�/c'i�iCT�U Water District for connecting provisionr, for this building's <br /> water and �ewer services. <br /> 19. A catch basin as per City 5tandard Plan #402 with a gas trap per Standard Plan #410 is <br /> required for the parking area. <br /> 20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br /> manhole, then gravity fiow across the public right-of-way. <br /> 21. A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> -- � • . � . . ; � _l�, C✓ ��t „s� �.� c�r�r': �� �� <br /> . <br /> ��'�= �rJ6� r� LC/'; �- ;�S���y�. <br /> PWCommenb � • �� "�/� <br /> — _ '__ � �.'� . "�7 � �i-ff�' -.y. ��, - . <br /> - �' <br /> • � . , � ,�.�. � . ' � : � _ � — .. , � /;:� . . <br />
The URL can be used to link to this page
Your browser does not support the video tag.