Laserfiche WebLink
PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public Works approved plan dated __ <br /> 5. Connect side sewer per City Standard #60i. <br /> 6. Connect side sewer per City Standard #'s 601, 602, 604. <br /> 7. Connect all roofiop downspouts to the side sewer. <br /> 8. Connect rooftop downs��outs to the drainage system provided for this lot. <br /> 9. Roottop runoff mus� be discharged to a roof downspout infiltration system per Cily of Everett <br /> Storm Manual 3�2.6.2. The approxiinate size trench is 3.5'wide, 2' deep and 25' long. See <br /> attachment for more details. <br /> 10. The contractor must meet with the Public Worhs Inspector to discuss potential drainage <br /> routing prior to beginning the project. <br /> 11. Install erosion control measures as determined by the Public Works inspeclor, such as silt <br /> fence, straw bales, swa�es, or erosion blankets. <br /> �12: Install erosion control measures per City of Everett Standards for small parcels <br /> ( 13, Remove erosion control measures upon completion o�the project prinr to final approval of the <br /> permit. <br /> 14. All excavated material from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permittec� site. No wasting uf matsrial is allowed on this buiid;ng lot. <br /> 15. Remove and repiace curb, gutter and sidewalk as per City of Evera:t Standard Plan #'s 305A <br /> 8 306 on this proposal's frontage as directed by ihe Pubiic Works Inspector (i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> 16. Install a Type I ccncrete driveway per City o( Everett Standard #?':7. <br /> 17 Pave driveway from the front property line cut to the street paving. <br /> /= <br /> (18,, Contact tne C;'"vci!i�r.T �� Water District for connecting provisions for this building's <br /> " water and sewer services. <br /> 19. A catch basin as per Cih� Standard Plan #402 with a gas trap per Standard Plan #410 is <br /> required for the parking area. <br /> 20. I(a sewer pump system is to be installed, the pressure line must discharge into a private <br /> manhole, then gravity flow across the public right-of-way. <br /> 21. A ,Hrmkler system is required for this building in compliance with the requirements of NFDA <br /> Slandards 13D. <br /> PWCommems Z/�' <br />