Laserfiche WebLink
r � <br /> ( <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public Works approved plan dated <br /> 5. Connect side sewer per City Standard k601. <br /> �T - <br /> � 6.�onnect side sewer per Ciry Standerd #'s 8�J1, 602, 604. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> r��.� Connect rooftop downspouts to the droinege system provided for this lot. <br /> 9. Roottop runoff must be discharged to a roof downspout infiltration system per Ciq� of Everett <br /> Storm Manual 3-2.6.2. Width _, Depih _, Length_ <br /> 10. The contractor must meet with the Public Works Inspector to discuss potentiai drainage <br /> routing prior to beginning the project. <br /> 1,1 Install erosion control measures as defermined by the Public 1Vorks inspector, sucli as silt <br /> ' fen�e, straw bales, sweles, or erosior. blankets. <br /> 12. Install eroeion control measures per Ciry of Everett Stan�ards for small percels <br /> � Remove erosi �n control measures upon completion of the pn�ject prior to final epproval of the <br /> permit. <br /> 14. II excavated material from foundation, sidewalk and driveways snall be neuled to an <br /> _ approved, permired site. No westing of inecorial is altowed on this building lot. <br /> 15. Remove and replace curG, gutter and sidewalk as per Ciry of Everett Standerd Plen k's 305A <br /> & 306 on this proposal':i frontage as directed by the PubNc Works Inspector (i.e. all unused <br /> driveways and any broken or damaged erea must bs replaced). <br /> 1 d. Ins'a�l a Type I concrete driveway per City of Everett Standerd #307. <br /> 17. Pave driveway from the front property line out to the street paving. <br /> 18. Contact the Water District tor connecting provisions for thls building's <br /> water and sewer services. <br /> 19. A catch basin es per Ciry Standard Plan #402 with a ges trap per Standard Plan M410 is <br /> required for the parking area. <br /> 20. If a sewer purnp system �s to be installed, the presaure line must discherge into a privete <br /> manhole, then gravity flow across the public right-of•way. <br /> 21. A sprinkler system is required for this building in compliance with the requirements o1 NFDA <br /> Standards i3D. <br /> PWCanment5 <br /> i�� <br />