Laserfiche WebLink
� ; . <br /> f <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public Works approved plan dated <br /> 5. Connect side sewer per City Standard k601. <br /> �6:� Connect side sewer per City Standard �'s 601, 602, 604. <br /> 7. Connect all rooftop downspou!s to the side sewer. <br /> �� 8.) Connect rookop downspouts to the dreinage system provided for this lot. <br /> 9. Rooftop runoff must be �ischarged to a roof downspout infiltration system per City of Everett <br /> Storm Manual 3•2.6.2. Width _, Depth _, Length _ <br /> 10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> rcuting prior to beginning the project. <br /> ��. Install erosion control measures as determined by the Public Works inspector, surh as silt <br /> - fance, straw bales, swales, or erosion blenkets. <br /> 12. Install erosion control measures per City of Everett Standards for s�nall parcels <br /> (��emove erosion control meesures upon completion of the project prior to final approval of the <br /> — permit. <br /> �4.�411 excavated material irom foundation, sidewalk and driveways shelf be hauled to an <br /> �approved, permitted site. No waeting o( material is allowed on this bui!ding lot. <br /> 15. Remove and replace curb, gutter and sidowalk es per Ciry of Everett Standard Plan N's 305A <br /> & 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br /> driveways and any brok9n or damaged area must be replaced). <br /> ?6. Install a Type I concrete driveway per City of Everett Standard N307. <br /> 17. Pave driveway trom the front property line out to the street paving. ! <br /> i <br /> 18. Contact the Water D�strict for connecting provisions tor this building's <br /> water and sewer services. <br /> 19. A catch besin as per Ciry Stendard Plan #402 vvith a gas trap per Star�dard Plan #410 is <br /> required forthe parking area. <br /> 20. If a sewer pump syetem ig to be installed, the pressure line must discharge into a privete <br /> manhole, then gravity flow across the public right-of-way. <br /> 21. A sprinkler system is required for this building in compliance with the requiremonts of NFDA <br /> Standards 13D. <br /> ?wc�+�re��s 2/Z <br />