My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1629 107TH PL SE 2016-01-01 MF Import
>
Address Records
>
107TH PL SE
>
1629
>
1629 107TH PL SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2017 3:00:07 PM
Creation date
4/14/2017 3:00:01 PM
Metadata
Fields
Template:
Address Document
Street Name
107TH PL SE
Street Number
1629
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public Works epproved plan dated <br /> 5. Connect side sewer per Ciry Standard p601. <br /> �6.�onnect side sewer per City Standord #'s 601, 602, 604. <br /> �/ <br /> 7. Connect all rooRop downspouts to the side sewer. <br /> �ie�onnect rooftop downspouts to the drainego system provided for this lot. <br /> 9. Rooftop runoN must be discharged to a roof downspout infiltration system per Ciry of Everett <br /> Storm Manuel 3-2.6.2. Width _, Depth _, Length � <br /> 10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> routing prior to beginning the project. <br /> 1}' Install erosion control measures as determined by the Public Werks inapector, such as silt <br /> fence, straw bales, aweles, or erosion blankets. <br /> 12. Install erosion control measures per Ciry of Everett a!�ndards for small parcels , <br /> .. <br /> 1� Remove erosion control measures upon completion of the project prior t� �inal epprovel of the <br /> permit. <br /> �1�All excavated materiel from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permided site. No wasting of ineteriel is allowed on this building lot. <br /> 15. Remove and repiece curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br /> & 30G on this proposal's frontage as directed by the Public Works Inspector (i.e. all unused <br /> driveweys and any broken or damaged area must be repleced�. <br /> 16. Install a Type I concrete driveway per Ciry of Everett Standard q307. <br /> 17. Pave driveway from the Iront proNerty Iine out to the street paving. <br /> 18. Contact the _ Water District for conner,ting provisions for this building's <br /> water and sewer services. <br /> 19. A catch besin as per Ciry Standard Plen q402 with a gas trap per Standard Plan #410 is <br /> required for the parking area. <br /> 20. If a sewer pump system �s to ba installed, the prassure line must discharge into a private <br /> manhole, then gravity flow across the public nght-of-way. <br /> 21. A sprinkler system is required tor this bui!ding in compliance with the requirements of NFDA <br /> Standards 13D. <br /> vtvcammems Z�1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.