Laserfiche WebLink
QASED QI WORR ORDERS REPORT <br />Total Utility Maintenance Manaqement System <br />__ __ -- -" 09/27/1996 Pdge 1 <br />��� �. ��� �����_T �. _�������� ��� __ <br />Date Ranqe :01/09/1989 - OS/26/1996 <br />CM Work Order Range :1001091070001 - UT2600-02- Pattern :7101186760001 <br />Item Range :<Blank> - WW22020001 Pattern :* <br />Proqram ALL Function ALL Activity aLL <br />CM WORK ORDER ID: 7101186760001 Title: REPAIR METER 9104 52ND ST SE �5 L���� <br />«DUPLICaTE PRINTING OF THIS WORK ORDER» <br />Item ID: __ <br />Location ID: -- <br />Program 710 Function 118 1,ctivity 676 <br />Date Completed: 09/06/1996 <br />Overall Craft: <br />Issued: 09/04/1996 Issraed by: G,7 Assiqned to: MWE <br />Out of Service? NO Priority: Travel Time: 0.00 Hr. <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID Name <br />----- ------ ---- <br />HEO BJC BOHNEgT, JAMES <br />, DL DJM DENNIS, JAMES <br />DL HCG Iil►ND(A, CORY G. <br />� ' DL MME MURRAY, MATHEW <br />; [7I. MWE MOORE, WARREN <br />![aterials: <br />ID <br />Description <br />C. <br />M. <br />E. <br />E. <br />ADAP34000447 ADAPTER 3/4° IPS UNION INSTA @ <br />ADAP34000547 �DAPTER 3/4° MIP X INSTA-TITE@ <br />CORP34001847 CORP STOP 3/4^ CCT X INSTA @ <br />COUF3�}004847 COUPLING 3/4^ SR•RaIGHT MET. @ <br />N/�+ TR2iCING WIRE ( STOCR ) <br />PIPE34060647 PIPE 3/4° POLY I.P.S. <br />SADD42015447 SERVICE SADDLE 4" W/3/4„ CCT <br />vehi�les: <br />ID Description <br />V0038 <br />V2111 <br />V2151 <br />'96 FORD 3/4 <br />92 CHEV 1-TON <br />86 CHEV 1 TON <br />TON 4WD <br />HYD. UNIT <br />Planned Hrs <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Actual Hrs <br />12.00 <br />Y6.00 <br />8.00 <br />8.00 <br />18.00 <br />Total Labor Cost <br />Date ,/ Used <br />09/05/1996 <br />09/05/1996 <br />09/05/1996 <br />09/05/1996 <br />04/05/1996 <br />09/05/1996 <br />09/05/1996 <br />1 <br />1 <br />Cost <br />239.04 <br />128.00 <br />64.00 <br />64.00 <br />275.58 <br />770.62 <br />Cost <br />9.11 <br />7.68 <br />1 14.64 <br />`_ 3.45 <br />7� 8.25 <br />5 8.00 <br />1 9.42 <br />Total Material Cost: <br />Hours <br />14.00 <br />4.00 <br />14.00 <br />Total Vehicle Cest: <br />__ Cost^__ <br />85.40 <br />22.40 <br />71.40 <br />174.20 <br />70. 55� <br />(�.3G <br />