|
d COMPLIANCE ' ' I , � • , ,
<br /> ' REOUIRED �
<br /> IN9PECT10N �MpaRTANT:Please au I Infortnetlon In the ahaded bozes end check the epproprlate
<br /> APPROVED pP y
<br /> � clrcles. Dlsrepard toplcs that don't descrlbe your bulldlnp or equlpment.DO NOT place
<br /> checks In the two left columns.
<br /> � � � • ��
<br /> ❑ p Q Ezterlor alab Ineulatlon, N nof/ocated on fhe lnfeNor, shall be R•10 (Table 6-2).
<br /> ❑ ❑ �Exterlor slab Insulatlon, N presenf, shall approved for below Arade use and proteded above grade.
<br /> ❑ e Walls, including rim7o�ts, shall be ineulated without comprnssion to {Table 6-2}: ' , ;;; ".
<br /> �]R-15 bafl (Optiors i,il) �t�•19 (Opilon 111. N,V;VI,VII)
<br /> ❑ �Intetlor b61ow gratle walls shall bo insWaied wlihout compressbn to (Table 8•ZJ:
<br /> " �R•15 (Optians I, Iq ,�rnv R•19{Optlons III, N, V,VI,VII)
<br /> ❑ QVauRbd c�liinps shali bo insul�ted without Compression to R�30(Table 6-2,All options)
<br /> ❑ Qi Skylight wall Insulatlon is installod and equivaienl to the requfred wall R-values above.
<br /> ❑ �Vepor retarders shall be Instailed loward the warm euriace as representad below(502.LE3);
<br /> Select one optbn for lloors, walis, end approprlato ceifinge:
<br /> Fioors: Plywood WI exterior plue �Poly(a a Mlq (� Backed bafls
<br /> Walls: Poty plastic(z 4 !r'iq Q Face-stapted, backed batta �(PVA paint
<br /> Ceilings: Not requirod where ventilalfon epace averages>12"ubove ineulation.
<br /> Fuce stapled backed batts (�Poly plastic (� 4 mil} � PVA paint
<br /> ❑ �Heatin8 system elficlency and slzing roqWrements shall be met as rapresented below:
<br /> O ❑ �j Neal Pump eHlclency shail be mot under the lollowing compllance path{S, a03.4):
<br /> �Spilt system, air source hoat pump:HSPF a 6.8,COP>3A
<br /> � Singlo padcage, alr source heat pump:HSPF a s.8, COP>3.0
<br /> Q Water source hqat pump:COP a 3.8 ,�
<br /> � Ground source heat pump COP a 3.0 � '
<br /> ❑ Q Central lorce-alr fumaco AFUE raling, as listed in the GAMA pireclory,shall be:
<br /> � 78 (OpUon6 I, II, IV, VI,VII) �� ,88 (Optlon III}} [�;,7q (Oplbn V)
<br /> � ❑ �No �central,combustion healing sysiems shall have intermitent i gnition
<br /> �'� ❑ � Maximum heating system output {150%of design heat IoadJ is _C3?'UAic (S.503,2.2)
<br /> ❑ ❑ e Hlgh e(Ilclency lorceq•alr lumace (s 58,000 BTU/hr.outpuqmay may exceed 750%01 DHL
<br /> because: �GAMA listed AFUE is� 78 + 1 per each SODD BTU/hr output Ihat it exceeds Ihe OHL.
<br /> WSEC Insuladon phase requlrements: �
<br /> Inspecfed by: _Dafe
<br /> �. , , , �
<br /> ❑ Q Envelope Flr�e?�,�all be Insulated wittwut compressbn, and wiih support s 24"O.C. to:�
<br /> �R14�(Opiions I, II, III, IV, V) Qp25(Opllons VI, Viq
<br /> ❑ QNon•vaultod, attic cellings shail t�e Insuiated wlihout comprar,slon lo:
<br /> See Table 6-2
<br /> (�R•30(OpUons I, II, III, IV, V, VII} ("�R38 (Optlon VI) ____�.._�
<br /> ❑ Q Door systems shall meel:�U.40 (�II oplions)
<br /> Licortypnsare (1)-------.___...----_�(2)_____.__.._.__._._ .(9)
<br /> -- -- — — Page 5 of G
<br />
|