My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
608 109TH PL SE 2016-01-01 MF Import
>
Address Records
>
109TH PL SE
>
608
>
608 109TH PL SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2017 4:47:03 PM
Creation date
4/14/2017 4:46:52 PM
Metadata
Fields
Template:
Address Document
Street Name
109TH PL SE
Street Number
608
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�--� � � � O M � D 1'ublic�1'orks Department <br /> I D 1 U 0 Ulilities Diviaion <br /> COST ESTIA1ATE SHEET I n� 3200 Cedar Strcet <br /> �'��� DEC - 2 1994 Evcrett, �yashington 98201 <br /> ._..._..__......__,.... ....._.....__......_. <br /> (206)259-8800 <br /> CITY OF EVERETT <br /> Reccipt N Public Works Dept. Datc Paid <br /> X Cost of Work Ordcr $ 22,G65.00 Work Ordcr N <br /> Cost of Scrvicc Ordcr $ Scrvicc Ordcr N <br /> Contact Pcrson Thomas Wagcs Tcicphone N 338-1755 <br /> Rcquested I!y Kirk Brooks Datc of Rcqucst 1 I-29-94 <br /> Property O��mcr(name) Mark Selby 1222 Springbrooks Rd. Lake Stevcns,WA 9R25R <br /> Charge Cost to(namc if diffcrcnt than o«mcr) <br /> Addrcss I OR 10 40th Avc SE City E actt Zip 98208 <br /> Installation Location 1091h SL' & 7th Avc SG <br /> Installation t}�pddcscripvon/sizc/ctc. Estimatc includcs all labor, matcrials and restoration to bc complctcd by <br /> ciN. <br /> 'The following estimate is bascd upon thc Utilitics Division providing all labor, equipment, materials, restoration, <br /> � and final hook-up. <br /> ❑ The following estimate is based upon the Strect Division�vork group providing all labor, equipment, materials <br /> and restoration to prcperty. <br /> Whcne��cr the cstimated cost is not auflicicnt to corcr the total czpense for labor, meterial, equfpment rental �nd <br /> rdministratlre coata, the Jeficlt ahall be chergcd to tUc property for nhich auch installation N•as made and lhe owucr <br /> thercaf,rnd provided furlhcr,that any cxccss paymcnt shall bc remrncd to the person applying!or the installallon. <br /> Itcmiud Coet Esllmatc: <br /> Lebor Rc Bcncfis S �0,920,00 _ cc: Bldg.Pemiil Countcr <br /> Clair Oli��crs <br /> Matcrial 3,023.00 Tom ThetCord <br /> Don Wcitknmp <br /> Equipmcnt Rcntal 2,782.00 Klrk Hrook� <br /> Gardon Wilchcr <br /> Surfacc Restora�ion 3,940.On Dan Lowcll <br /> TOTAL S 22,CG5.00 <br /> � <br /> Prcpared by: l �i.,_ <br /> Acccpted by: Rcprescn�ing: <br /> CCSiAGNDLM0El11 L91N11 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.