Laserfiche WebLink
fv �'u�� Ii:;i__�L=1-���'`� ` <br /> CLOSED CM WORK ORDERS REPORT <br /> ' City of Everett Total Utility Maintenance Management System <br /> 03/22/1994 Page 1 <br /> ��va��sac=srssasaaaeevsaeaeea=xvaaa�anva'a¢naesaa�aaevaaec�caxvaeeca��aa�aa=e <br /> Date Range :03/O1/1992 - 03/18/1994 <br /> CM Work Order Range :<Blank> - 8405421080229 Pattern :7401196647597 <br /> Item Range :<Hlank� - WW22020001 Pattern :* <br /> Program ALL Function ALL Activity ALL <br /> �evsa�avsvms�assass��sasmesa¢s:�seas�vae�seta�sss�esss��ssssm�s�saseasovsssseses <br /> CM WORK OkDER ID: 7401196647597 Title: SO 316 109TH ST SE <br /> Item ID: -- <br /> Location ID: -- <br /> Proqram 740 Function 119 Activity 664 <br /> Date Completed: 03/O1/1994 <br /> Overall Craft: <br /> Issued: 04/09/1993 Issued by: SKL Assiqned to: <br /> Out of Service? NO Priority: Travel Time: 0.00 Hr. <br /> Meter Readinq: <br /> Downtime: 0 hours <br /> status: <br /> Labor: <br /> Craft ID . T!ame Planned Hrs Actual Hrs Cost <br /> ----- ------ ------------------------------ ----------- ---------- ---------- <br /> WST M1tC MOORE, KIM C. 0.00 6. 00 118.38 <br /> WST SRJ STENSETH, ROBERT J. 0. 00 6.00 117.54 <br /> UL TDE1 THOMPSON, DWAYNE E. 0. 00 6. 00 82.08 <br /> Total Labor Cost: 318.00 <br /> Materials: <br /> ID Description Date � Used Cost <br /> ------------ ------------------------------ -------- -------- ---------- <br /> ADAP34000547 ADAPTER 3/4° MIP X INSTA-TITE@ 03/O1/1994 1 8.06 <br /> BOX000056247 AOX METER PLA 15" X 10" W/LID 03/O1/1994 1 12.34 <br /> CORP34001847 CORP STOP 3/4° CCT X INSTA @ 03/01/1994 1 15.66 <br /> PIPE34060647 PIPE 3/4" POLY I.P.S. 03/O1/1994 35 8.75 <br /> SADD46018247 SERVICE SADDLE 8" W/3/4" CCT 03/O1/1994 1 13.22 <br /> SETT34033647 SETTER COP 5/B" X 3/4" LGTH15" 03/O1/1994 1 47.78 <br /> WIRE00119847 TRACING WIRE 10 GAUGE 03/O1/1994 35 2 .45 <br /> Total Meterial Cost: 108 26 <br /> Vehiclae: <br /> ID Description Date Houre Co�t <br /> ------------ ------------------------------ -------- ------ ---------- <br /> V2119 CHEV 5 TON 91 03/O1/1994 6.00 62.4G <br /> V2139 SVC TRUCK CHEV 86 03/O1/1994 6.00 30.60 <br /> V3505 BACKHOE CASE 82 03/O1/1994 6.00 103.80 <br /> Total Vehicle Cost: 196.80 <br /> Work Description: <br /> -------------------------------------------------------------------------------- <br /> 3/4" SFR <br />