Laserfiche WebLink
PULLiC WORKS PERMIT COMMENTS <br /> 4. As per Pubii�Works approved olan dated _ ___ <br /> 5. Connect side sewer per City Standard #60'. <br /> � 6.� Connect side sewer p �r City Sta idard q's b01, 60?, 604. <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> 8. Connect roofiop downspouts to the drainage syste m provided for this lot. <br /> 9. Rooftop runofi must ue discharged to a roof r+rvnspout infiltration system per City ot Everetl <br /> Storm Manuai 3-2.6.2. The approximate siz_ trench is 3.5' wide, 2' deep and 25' long. 5ee <br /> attachment for more details. <br /> C1� The contractor must meet with the Public Works Inspector to discuss potential �lrainage <br /> routing prior io beginning the project. <br /> /� , <br /> (11./ Install erosion control measures as delermined by the Public Works inspector, such as sill <br /> fence, straw bales, swales, or erosion blankets. <br /> 12. Install erosion control measures per City of Everett Standards tor sriall parcels <br /> j' 13,; Remove eresion conirol measures upon completion of the project prior to final approval o( the <br /> � permit. <br /> �`�d- All excavated material irom foundalion, sidewalk and driveways shall be hauled to an <br /> ,.-� approved, permitted site. No wasting of material is allowed on this building lot. <br /> 15. Remove and replace curb, gutter and �idewalk as per City of Everett Standard Pian #'s 305A <br /> & 306 on this proposal's irontage as directed by ihe Public Works Inspector (i.e. all unused <br /> driveways and any broken or damaged area must be ieplaced). <br /> 16. Install a Type i concrete driveway per City ot Everett Standard #307. <br /> 17. Pave driveway from the front property line out to the street paving. <br /> 18. Contact the_ Water District for connecting provisions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per Ciry Standard Plan �t40^< with a gas trap per Standard Pian #410 is <br /> required for the parking area. <br /> Z0. If a sewer pump system is to be installed, the pressure line must discharge into a pnvate <br /> manhole, then gravity flow across the public right-of-way. <br /> �1 A sprinkler system is reqwred for this budding in compliance wilh the requirements o( iJ�=DA <br /> Standards 13D. <br /> ,� _.,.,.r,ns - <br />