15 Permits rre required from the F ie Dep:rtinent for removal and installation of underground <br /> fueltanis. <br /> 16. Abandoned tanks shall be pumped out and the fuel properly disposed of prior to removal. <br /> IJo product or rinse water may be dispo sed of in such a way ihal it could enter the storm <br /> drains syslem. <br /> 1-'. All fire alann control panels (FACP) and sprinkl,�r valves shall be in heated rooms or closels <br /> �vith standard man door access Lor.atiuns sha" be approved by the Fire Marshal's Of(ice. <br /> GENERAL INFORMATION <br /> 1 Puget Soi�nd Energy is the natural gas provider m this area. To initiate new service orders, <br /> please anlact Marilyn Davis Westlund at (425) 356•7512 at ieasl 90 days prior to the <br /> required in-service date. <br /> Any relocation oi existing gas facililies for ihis development will be at the developer's sole <br /> expense, and requires 90 days minimum notice. Please contact Elaine �abby at (206) 224- <br /> 2018 to coordinate relocation requests. <br /> : The Snohomish County PUD currently has sufiicienl capacily to serve the proposed <br /> development. For furihe-information about the eleclrical service requirements for this <br /> p;ojecl, please call Kurt Martin of the District's Customer Engineering Office, Everett at 258- <br /> 8291. <br /> ? Verizon North�vest has facilities near ihis location. However, any building entrances must <br /> be coordinated aI least 60 days in advance. The cosl of any relocation of Verizon (acilities <br /> that is required lo construct ihe new apartmenls will be at the total expense ef the <br /> developer. Any relocation �vill take 60 to 120 days. Please contact Mike Hupf, Engine�r ai <br /> (•125) 35G4052 or Mike Bly, Engineer at (425) 35G-4034 if you have any questions <br /> �egarding ihis building entrance. <br /> 4 Ve, zon Northwest v+ill provide service ro the site. However, nev:telephone catle <br /> con:truction will be required in conjunction with the site development. Verizon's <br /> eng neering will begin vfhen they are noli(ied of your construction schedules and lele�hone <br /> req�irements. <br /> 5 It vaill ba lhe developer's responsibility to provide a suitable combination of conduit and <br /> trenching and/or riser conduit to accommodate Verizon's network communications cable <br /> ���ifhin the complex. Provided that an acceptable combinalion of conduit andlor trenching is <br /> incorporated inlo the project to accommodate Verizon's enirance cable, there will be no <br /> cests to the developer for Verizon's cable. <br />