Laserfiche WebLink
112 th Super:?umper <br />Drainage Design CAculations <br />Index <br />Storm Drainage Schematic <br />1 <br />Project Site & Soils Type <br />2 <br />Soil Legend <br />3 <br />2 Year 24 Hour Storm Hyctagraph <br />4 <br />10 Year 24 Hour Storm Hyctagraph <br />5 <br />100 Year 24 Hour Storm Hyctagraph <br />6 <br />Drainage Basin Summary, a2, Undeveloped 2 yr. storm <br />7 <br />Drainage Basin Summary , a10, Undeveloped 10 yr. storm <br />9 <br />Drainage Basin Summary , a100, Undeveloped 100 yr. storm <br />11 <br />Drainage Basin Summary , A2, Developed 2 yr. storm <br />13 <br />Drainage Basin Summary, A10, Developed 10 yr. storm <br />14 <br />Drainage Basin Summary, A 100, Developed 100 yr. storm <br />15 <br />Developed Impermeable area calculation <br />16 <br />Predeveloped site slope <br />17 <br />Wet Pond Permanent Storagc, Wet Pond & Tr-eatment <br />IS <br />Cell Calculation <br />Treatment Storage TSD4 Stage Storage Table <br />19 <br />Treatment Storage Orifice STR4 Stage Discharge Table <br />20 <br />Treatment Storage Riser TSR4 Discharge Table <br />21 <br />Treatment Storage Combined Outlet TSC <br />22 <br />Stage Discharge Table <br />TS Level Pool Routing Flow & Volume Summary <br />23 <br />through TSD4 & TSC <br />Pipe Storage Orifice (PSO) Stage Discharge Table <br />24 <br />Pipe Storage Level Pool Routing Flow & Volume Summary <br />2 Year System Outlet Hydrograph <br />25 <br />26 <br />10 Year System Outlet Hydrograph <br />28 <br />100 Year System Outlet Hydrograph <br />30 <br />