Laserfiche WebLink
Date <br />Applictnj)on For <br />PUBLIC W06KS PERMIT <br />C1 <br />101 G7CJC�G7Q <br />Print or Type Only <br />c» g L y v; ya <br />r� Cr c•j <br />Public Works Permit # 99,,,44 <br />Bldg. Dept. # <br />Public Works Fee <br />Total Fee $ — <br />Less Appl. Fee Paid $ <br />Balance Due $ �— <br />,,r/11,t4' -zzzz <br />Owner M?Fi�rgile Q City Zip Phone <br />O� C7 . ■ ■ r� <br />CA ©r <br />Applicant Mailing Address City Zip Phone <br />r <br />Describe Proposed Work <br />Project Address (if known) <br />//2 N <br />Attach four (4) copies of plans for proposed work - Draw to scale and note the following as applicable: <br />• Property Lines • Centerline of street <br />• Outline and dimensions of all existing and • Indicate North <br />proposed structures on the lot • Show any proposed grading changes <br />• Existing and proposed utilities • Show measurements <br />DO NOT WRITE BELOW THIS LINE <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hrs. in advance - phone 259-8810. <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1-800-424-5555. <br />41 4-40-89 <br />nstruction <br />Date <br />FINAL INSPECTION Date <br />Approved as Constructed <br />i <br />PUBLIC WORKS DEPARTMENT <br />EverCedar Street <br />Everett, WA 98201 <br />Phone: 259-8810 <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and save harm- <br />less the City of Everett from any and all claims for damages, costs, <br />expenses, or causes of action that may arise because of installation <br />and maintenance of the improvement or other right-of-way use hereto <br />applied for and further agrees to remove same upon notice from the <br />City and to replace public property damaged thereby. <br />Signature of Applicant "Pwo-i^ r' hate <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN <br />180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO <br />BE DILIGENTLY PURSUED TO COMPLETION. THIS PERMIT MAY BE <br />CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS <br />PROJECT OVER 90 DAYS DURATION. <br />