Laserfiche WebLink
PUBLIC WORKS <br />E ETT <br />MEMORANDUM <br />TO: Alan Locke <br />FROM: Jane Zimmerman <br />DATE: February 13. 1997 <br />SUBJECT: Drainage Calculation Review, Dennis Petroleum, 16th and 112th <br />St. SE <br />Wetoond/D to tion: <br />The design depth of dead storage in the wetvault and treatment cell must be given in <br />the calculation package. The wetvault is required to have a dead storage depth of 3-6 <br />feet, the wetland treatment cell may have a maximum average depth of 1.33 feet. A <br />maximum of 70% of the wetpond design volume may be associated with the open water <br />cell/wet vault. A minimum volume equal to a 15 minute detention time for the peak <br />Flow from the design storm must be associated with the open water cell or a wetvault. <br />Wetpond calculations must be provided. The wetpond design volume is equal to the <br />volume of the 2 year, 24-hour developed storm hydrograph. The standards require a <br />minimum of 50% of the wetpond design volume to be provided as permanent dead <br />storage and for the entire wetpond design volume to be reached during the wetpond <br />design storm. Routing of the wetpond design storm through the pond is required to <br />verify that the wetpond design volume is reached for the wetpond design storm. The <br />size of the primary orifice can be decreased as necessary, to a minimum allowable <br />orifice size of I inch, to achieve enough live storage. If' 1 inch orifice doesn't result <br />in the required storage in the pond, then the percentage of the wetpond design volume <br />provided as dead storage must be increased until the combination of dead storage and <br />peak live storage (during the wetpond design storm) equals the wetpond design volume. <br />Miscellaneous <br />This project is utilizing the biofiltration swale located on the adjacent property to <br />provide part of this project's required runoff treatment. However, the existing Swale <br />does not meet current City standards, particularly with respect to vegetation in the <br />swale. For the requirements of this project to be satisfied, wetland vegetation must be <br />planted in the swale in accordance with current City standards. In addition, to decrease <br />the effective slope of the swale, three additional check dams must be constructed in the <br />swale. One of these must be located approximately 2-3 feet from the swale outlet; the <br />other two should be located midway between the two existing check dams. The <br />existing check dams appear to be constructed of 4-8 inch riprap and are about 6-12 <br />inches high and a foot or so wide. This design appears adequate for this Swale and can <br />be utilized for the new check dams. <br />