Laserfiche WebLink
7 6. Please provide lighting power allowance calculations for the exterior of the <br />buildings including the canopy. See footnote 6 - Table 15-1. <br />/7. An 18" unobstructed floor space is required on the strike side of the door through <br />,,, �r�.,,/��J the counter area. <br />NO 8. Flooring material within toilet rooms must extend 5" minimum up walls. Sec. <br />807.1.1. <br />1/9. Flush controls must be located on the open side of accessible toilets. Sec. <br />1106.11.5.4. <br />V 10. Please indicate roof access. <br />✓11. Roof drains must be lightlined to storm sewer. <br />Upon submittal of [lie drawings, your application will be given priority and plan review <br />will commence. <br />All required submittals shall be of sufficient detail and contain sufficient information to <br />ensure that the proposed structure will be constructed in compliance with all adopted <br />codes. <br />Si <br />Engineer/Building <br />)M jd,S j <br />