Laserfiche WebLink
D. SECTIONS AND ELEVATIONS <br />Usable space under Floors <br />Guardrail construction <br />✓ Wall assemblies and construction (area/occupancy, <br />Floor/ceiling assemblies and construction <br />Roof/ceiling assemblies and construction <br />Fire blocking <br />Parapets per <br />Insulation perr calculations or Energy Code <br />HEAT SOURCE Gas Electric <br />separation) <br />Semi -heated <br />REQUIRED (PRESCRIPTIVE) . <br />- SHOWN <br />Below grade walls <br />Below grade walls <br />Slab edge <br />Slab edge <br />Wall <br />Wall <br />Floor <br />Floor <br />Roof <br />Roof <br />Windows <br />Windows <br />Window area <br />Window area <br />Doors <br />Doors <br />Skylights <br />Skylights <br />�) Wall bracing for partial neight walls <br />Corridor section <br />Equipment seismic bracing <br />T— F & T ratings for rated wall/ceiling/floor penetrations <br />Exterior stair proximity to windows <br />V'-- Safety glass <br />E. REFLECTED CEILING PLAN <br />lu�l�ilia�v <br />Light fixtures and wattages <br />17 Lighting energy budget calculations <br />1� Light switching per W.S.E.C. (daylighting, number of lights per circuit) <br />Draft stops <br />Attic/roof access <br />Exit signage and lighting (emergency power) <br />Seismic bracing <br />Smoke/heat vents <br />Draft curtains <br />F. ROOF PLAN <br />Roof access [stair 1006.14] and mechanical per UMC <br />Ventilation <br />Rainwater drainage and overflow <br />Roof covering class <br />Skylight glazing <br />Roof slope <br />_ Mechanical equipment compliance with W.S.E.C. <br />m-plawk Rev: July 17. 1995 <br />