Laserfiche WebLink
n <br />Total Utili�tyEMaintenanceRManaqeme�tTSystem �� �USl�IYG A��� Q ���yy� <br />06/2G/1995 Page 1 <br />______________________________________________'___=______________________________ <br />Date Range :O1/09/1989 - 06/26/1995 <br />CM Work Urder Range :1001091070001 - UT2G08- - Pattern :7101196648469 <br />Item Range :<Blank> - WW22020001 Pattern :* <br />Proqram ALL Function ALL Activity ALL <br />_________________________________ <br />-_____'-_________________________________________ <br />CM WORK ORDER ID: 7101196G48469 Title: SO .75 INCH 1600 112TH ST SE <br />Item ID: __ <br />Location ID: __ <br />Program 710 Function 119 Activity G64 <br />Date Conpleted: 06/22/1995 <br />Overall Craft: <br />Issued: 06/08/1995 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID <br />---- ------ <br />UL LMA <br />UL SSJ <br />WST TDE1 <br />WST WDT <br />Materials: <br />ID <br />ADAP34000547 <br />BOX000056247 <br />COkP34U13447 <br />ELL034104247 <br />METE36089447 <br />PIPE340G0647 <br />SADD50019747 <br />SETT34033G47 <br />WIRE00119847 <br />Issued by: WMW Assiqned to: <br />Priority: Travel Time: 0.00 Hr. <br />Name Planned Hrs Actual Hrs <br />--------------------------- - <br />---------- ---------- <br />LIBBING, MAURICE A. 0.00 5.50 <br />SMITH, STEVE J. 0.00 3.00 <br />THOMPSON, DWAYNE E. 0.00 6.00 <br />WALDEN, DAROLD T. 0.00 3.00 <br />Description <br />ADAPTER 3/4" I4IP X INSTA-TITE(� <br />BOX METER PLA 15" X 10" W/LID <br />CORP STOP 3/4" CCT X COP (� <br />ELL 3/4" STREET BRASS ' <br />METER 5/8" X 3/4" NEPTUNE T-10 <br />PIPE 3/4" POLY I.P.S. <br />SERVICE SADDLE 12" W/ 3/4" CCT <br />SETTER COP 5/8" X 3/4" LGTH15" <br />TRACING WIRE 10 GAUGE <br />Total Labor Cost: <br />Date <br />06/22/1995 <br />06/22/1995 <br />OG/22/1995 <br />OG/22/1995 <br />OG/22/1995 <br />OG/22/1995 <br />06/22/1995 <br />OG/22/1995 <br />OG/22/1995 <br /># Used <br />1 <br />1 <br />1 <br />1 <br />1 <br />10 <br />1 <br />1 <br />12 <br />Total Material Cost: <br />Vehicles: <br />ID Description Hours Cost <br />---------- ---------------/------------ <br />-- ------ ---------- <br />V2117 91 CHEV 1-TON HYD UNIT 3.00 16.80 <br />V:14G 87 CHEV 1 TON W HYD. UNIT 3.00 15.30 <br />Total Vehicle Cost: 32 10 <br />Cost <br />81.57 <br />45.09 <br />98.10 <br />60.24 <br />285 00 <br />Cost <br />7.91 <br />12.94 <br />8.73 <br />1.73 <br />31.02 <br />2.60 <br />17.79 <br />48.4G <br />1.20 <br />132.38 <br />Work Description: <br />---------------------------------------------•---------------------------- <br />