Laserfiche WebLink
4. <br />5. <br />C.9' <br />PUBLIC WORKS PERMIT COMMENTS <br />As per Public Works approved plan dated <br />Connect side sewer per Ciry Standard #601. <br />Connect side sewer per City Standard #'s 601, 602, 604. <br />Connect all rooftop downspouts to the side sewer. <br />Connect rc�ftop downspouts to the drainage system provided for this lot. <br />9. Rooftop runoff must be discharged to a roof tlownspout infiltration system per City of Everett <br />Storm Manual 3-2.6.2. The approximate size trench is 3.5' wide, 1' deep and 25' long. See <br />attachment'for more details. <br />10.� The contractor must meet with the f'ublic Works Inspector to discuss potential drainage <br />� routing prior to beginnirg the project. <br />11. Install erosion conlroi measures as d?termined by the Public Works inspector, such as silt <br />fence, straw bales, swales, or erosion blankets. <br />12 Install erosion control measures per City of Everett Standards for small parcels <br />(,rd. � Remove erosion contral measures upon completion o( the project prior to final approvai of the <br />� permit. <br />14 ` All excavated material from foundation, sidewalk and driveways st�all be hauled to an <br />ap�rov�d, permitted site. No wasting of material is allowed on this building lot. <br />15. Remove and replace curb, gutler and sidewalk a� per City of Everett Standard Plan #'s 305A <br />8 306 on this proposal's frontage as directed by the Public Works Inspector (i.e. ali unused <br />driveways and any broken or damaged area must be replaced). <br />�6 <br />17. <br />Install a Type I concrete driveway per City of Everetl Standard #307. � Z'� MP� ��'�%��P'�-r( <br />Pave driveway from the front property line out to the street paving. <br />18. Contact the Waler District for connecting provisions tor this building's <br />waler and sewer services. <br />19 <br />20. <br />2? <br />� ratch basin as per City Standard Plan �402 with a gas trap per Standard Pian #410 is <br />required (or the parking area. <br />If a sewer pump system is to be installed, the pressure line mu�t discharge into a private <br />manhole, then gravity flow across the public right-of-way. <br />A sprinkler system is reyuired for this building ir compliance wich the requirements of NFDA <br />Standards 13Q. <br />P�,1 Carrme�its <br />