My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1019 112TH ST SW 2016-01-01 MF Import
>
Address Records
>
112TH ST SW
>
1019
>
1019 112TH ST SW 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2017 2:46:40 PM
Creation date
4/14/2017 7:59:51 PM
Metadata
Fields
Template:
Address Document
Street Name
112TH ST SW
Street Number
1019
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ProJect Name Hayashi Medical Clinic Traffic Reviewer MGB <br />Project Localion 1079 1121h Slreet SW Dev Rovlewer BS <br />Project Descrlptlon 24,900 Medlcal Clinlc Planner OT <br />Received Date 4/71/2006 Due Date 4i20�2006 Rrtview Date 4i12i2006 File M SEPA OS-066 <br />Area Type �CBD �SW Everett ❑X Remamder <br />�TRAFFIC STUDY RE�UIRED <br />and Project Conditions and Phasing <br />^ Existing Land Uses <br />� Pro�ect Land Uses <br />fe Exisling PM Peak Tnp Generation <br />fe Pio�ect PM Peak inp GeneraUon <br />P�d Peak Tnp Genera0on on tra(hc count of ex�st�ng or s�mitar sqe <br />fe pro�ed phasing, including the s¢e and schetluled completion date o! each phr,se <br />ty number ot bedrooms per dwelling unit or dwelhng units per structure <br />Mitigatlon Fee Eatimate (NOTE • Fees may be recalculated at submitlal II changea to proJect occur) <br />ProposeA Development TraHic Fee Estimate (From Worksheet 1. attached� <br />Existing Site Use Cred�t (From Worksheet t atlached) <br />Estim2te of Net Traffic Impac� Fee (Including F�.r�st�ng Use Credit� <br />Traffic Mdigation Fee Es�imateA <br />$116A84 <br />- 50 <br />= $116084 <br />Issues <br />� eonslruction phasng ind tunelini� informahon <br />� evidence ihat parking wdl be adequately provided lor throughout pro�ect <br />� eslimate ol peak construction period treflic volumes <br />� and ge� app�oval lor traB�c control plan prwr to any interupUons to �he local street neM1vork <br />Improvemenla <br />rvide F�ontage Improvements X as neetled <br />rvitle Roadwaylmprovements asneeded <br />�wde Pedesinan/Bicycle Improvemenis as needed <br />wide Alley ImprovemeNs as needed <br />rvide ADA�approved wheel chav ramps at all crosswalks <br />�wde 1 ransd Shelter �I pro�ecl hontage includes Iransit stop <br />from <br />from <br />trom <br />f; om <br />Clty ol Everett StaK Use Only <br />to <br />W <br />to <br />to <br />`/� <br />
The URL can be used to link to this page
Your browser does not support the video tag.