Laserfiche WebLink
Grn�eclmica! f:r�Fineering Reporr 1 Ocfo6er 1%, 1005 <br />Cumnurnr�� Hca!!h Cen�cr, Everc�r, 11 A Projec� N1005-19h <br />1.0 PROJfCT DF,SCRIPTION <br />"1'he project site is locatcd at 1019 and 1027 - 112`h Street SW in rveret4 Washington. Thc <br />approximatc location of the sitc is show�n on thc Site Vicinity Map, Figure 1. Thc north <br />portion of the sitc is co��cred by bushcs nnd trecs. The suuth por,i�n of the site is grnvcl <br />co��cred parking. <br />Rilcy undcrstands that thc o��mcr is pinnning to dc��clop a parcc� of land approximatcly 2.5 <br />acres mid build a community hcalth ccntcr building N�itli associated parking. Our <br />undcrstanding ofthc projectis bascd on a sitc plan prepared b} Millcr Hayashi Architcct.� <br />LLC dated Octobcr 13, 2005. At thc time of the prcparation of this rcport, detailed sitc <br />grading and building plans werc not available for our rcvicw. Based on the conversntion <br />��•ith client, thc proposed hcalth ccntcr building �t•ill bc twa-story stecl/concrete-framcd <br />strucwrc, supported an perimctcr walls ���ith a bclring load of 4 to 6 kips per lincar foot, <br />and a scrics of columns �cith a maximum load up to I50 kips. Thc lower Ic��cl 11oor ���ill bc <br />supportcd on slab-on-gradc. <br />'1'hc rccommcndations in thc following scctions of this rcport arc bascd uron our <br />understanding of the aboec design fcatures. If actual features vary or changes :i;c madc, <br />�a�c should revicw thcm in orJcr to modifq our recommcndations as rcquired. In addition, <br />Rilcy requcsts to re�•ic��� final dcsign dra�sings and specifications to vcri�'y that our projcct <br />undcrstanding is correct and thnt our rccommcndations ha��c bccn properly intcrprcted and <br />;ncor�orntcd into projcct dcsign and constructiun. <br />2.0 SCOPF, OF WORK <br />On Oc�obcr ld. �005, Rilcy c�cavatcd n totnl ol�cight tcst pits to a n;asimum dcpth of 10 <br />Icct hclo�v Uic cxisting surface grndcs. Test pits ���ere cxcavated using a ruhhci-tircd <br />hackhoc. 'Icst pits TP-l. 1�P-2. T'Y-7, and TP-R ���ere exca�•atcd in dic proposed pa;king <br />arc:i and tcsi pits'I'P-3 through'1'P-G �vcrc cxca�atcd ���ithin thc proposcd building footprint <br />a.ca. 1'hc apprmimatc tcst pit locations are sho���n on Pigurc 2. <br />l�sin� thc informaiion ob�aincd f�um our suhsurfacc c?�ploration, �rc performed analyscs to <br />Jc�clop gcotcchnical recommcndations for pn?jcct dcsign and construction on thc <br />�iillo�cin�: <br />: tioil and ground�catcr conditions : Slab-on-gradc support <br />� ticismic considcrations : Rctaining �valls <br />: Sitc prcparation anJ grading i Uti�hics <br />i titruclural lill rccontmrndations i I'a��cmcnts <br />� Fuwiduti�,n su��iort <br />I hr Rilcy Grour, Inc. <br />