My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1505 112TH ST SW 2018-01-02 MF Import
>
Address Records
>
112TH ST SW
>
1505
>
1505 112TH ST SW 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2023 9:32:12 AM
Creation date
4/14/2017 8:04:26 PM
Metadata
Fields
Template:
Address Document
Street Name
112TH ST SW
Street Number
1505
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MUK/LTEODISTRICT <br />806 51h Street <br />P D Box 260 <br />Mukiffea WA 98275 0260 <br />(206) 3553355 <br />December 8, 1992 <br />Mr. Cordon Witcher <br />City of Everett <br />Public Works Department <br />3200 Cedar street <br />Everett, WA 98201 <br />RE: Vehicle Emissions Testing Station <br />Dear Mr. Witcher: <br />In accordance with our conversation on December 7, 1992 it is my <br />understanding that this proposed project is within the Mukilteo <br />Water District service area and inside the Everett city limits. <br />In an effort to reduce duplicate plan review and inspection we <br />agreed the City will review and approve the water and sewer <br />plans. Approval will generally be as the plans are that were <br />submitted to me November 25, 1992. The City will inspect the <br />water and sewer syntems as they are being installed in <br />accordance with the city Standards. <br />The modification that will be made to the water and sewer plan <br />is that the 8" water system will be stubbed to the east property <br />line to provide for a future looped system. The domestic water <br />meter and deduct meter shall be installed north of the side walk <br />on the new 8" water main, in accordance with the Water <br />District's Standards and Specifications. <br />The Industrial Pre -Treatment paperwork will be processed by the <br />City of Everett and a copy supplied to the Mukilteo Water <br />District. <br />Upon completion of the installation, satisfactory pressure <br />testing and bacteriological sample the Mukilteo Water District <br />will accept service applications from the Developer. The <br />Developer will be required to pay the District's standard water <br />and sewer connection fees. The District will bill the customer <br />for water and sewer service bi-monthly. The Developer will also <br />dedicate the system and easements to the City for ownership. <br />The Mukilteo Water District will operate the system in <br />accordance with our agreement with the rity of Everett. If you <br />have any questions or concerns, please contact me. <br />Sinc y, <br />�� <br />nisi E. Hammer, Manager <br />Mukilteo Water District <br />
The URL can be used to link to this page
Your browser does not support the video tag.