Laserfiche WebLink
RECEIVED <br />HYDRAULIC PROJECT NOV 2 7 S92 <br />APPROVAL BUSH. AOEO I HITCNINGS INC <br />R.C.A. 7a.20.100 DEPARTMENT OF FIBMENTES <br />R.C.N. 7a.20. 101 Garnl AOclnistntlta SIdN. <br />0(7.OIN, WNMlroten 98504 <br />© November 24_F 1992 (206) 731-6650 <br />DEPARTMENT R HIERIES tgpllc Ant Mould "for to ININ dot* In all carroopmdwrU <br />PAR T OF 1 PARS <br />IIEIYAST NINE rIESI F�TACT PNOIIE(S) <br />LJ Cummings, Brent L 723-4144 <br />[.1C lam MMEE <br />J 00-36354-01 <br />RET-TO RntlriEOTf------ <br />7 a o LEIA <br />Tv 2009 Minor Avenue East <br />08.0059 <br />-- IWATE 9810--- <br />Seacc��t�Yle NA <br />IA --�1T -- <br />_ <br />I�AT DI T wam Y T reek <br />Unnamed p c -- <br />(Tstorm ra nage <br />_ _ <br />TJp�11wlA�T[R tEC110I Tawssv UNRu-W) MLn <br />JEECII04 HE 21 2BN 04E Snohomish <br />_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ <br />I _ — _ — — — _ — — <br />E, IMIS PRPIECT PAY BEGIN <br />L6)1AD lust BE COMPLEIEU ET <br />TINE LIMITATIONSs <br />1J Immediatel <br />_ November 1, 1991 <br />TNIS APPIRWAL is TO BE AJJILLLE ON THE JOB SITE AT All IEEE AID ITS PAONISIOMS TRLUM BTU PEIIITIMIF AID REMTR PENFGIOIING <br />IRE OWN. <br />SCIIBPO jniGD=jFY MW® QK Wf SI SM Or11MIL <br />1. work shall follow the plane by Bush Hoed i Hitchings Inc. for the <br />dated November 5, 1992. <br />Vehicle Emission Testing St at on Site 11, <br />Pond detention and release rates for eto��mmwater shall be <br />by Bush, <br />constructed based on the Drainage Analysis for the site <br />Road i Hitchings, Inc., dated November 6, 1992. <br />2. Erosion ^ontrol methods shall be utiliyed to prevent muddy water <br />f om leaving the property These may include, but shall not be <br />1 mited to, temporary sediment ponds, straw bales, filter fabric <br />fences, check. dame, and mulching of exposed areas. <br />1. The detention system shall be constructed with restrictive orifices <br />24 hour <br />set at half of the pre -developed, 2-year peak for the 2-year, <br />developed design storm and the pre -developed, 25-year release rate <br />for the 25-year, developed design storm. <br />LOCATION: About 100 feet west of State Route 99 on 112 Street Southwest <br />in Everett. <br />1t:01 <br />ARM Final MDNS by Everett September 22. 1992. <br />REGIONAL W19T1L+ucEN Mike Ciiamblin (206) 179-1718 <br />PATRDL - Nelson <br />APPLICANT - WILDLIFE - NEVER - PATROL - W. NQ. - MIA <br />DEPARTMENT OF FISHERIES DIRECTOR <br />