Laserfiche WebLink
Page two <br />Raqe Cage <br />Landscape estimate <br />7. Sark Mulch <br />landscaped <br />Cost $16.50 <br />LABOR COST <br />Approximately 20 yde., at 3" deep, over entire <br />area to control weeds and retain moisture. <br />per yd. @ x 20 = $330.00. <br />it is eatimated labor coata of $150 = 1 man day. it is eatimated <br />the landscapinq would take 2 man days. $150 @ 2=$300.00. <br />DEFINITION OR SUCCESS <br />Succeae ahall be defined as BOA survival of each species. <br />CONSTRUCTION AND MAINTENANCE NOTES <br />All site landecap�.ng will be inetalled prior to certificate of <br />occupancy. Unleas written permiasion from Snohomish �ounty <br />Planninq Department. Location of planting is shown on the site <br />plan. Competition from grass and annual weeda ahall be <br />controlled. Whenever posal.ble, native trees and shruba will be <br />used with the landscape enhancement plan. The landscaping will be <br />completed up to the proposed NGPA as noted on the site plan. <br />PROJECT ASSURANCE <br />An eighteen month assurance bond will be deposited with Snohomish <br />County in the amount of 1008 of eatimated cost for materials and <br />labor. This assurance bond shall be in effect from the spring <br />planting date until the fall inspection of the second growing <br />years. <br />ASSURANCE BOND AMOUNT <br />Assurance bond will be posted in the amount of $1,382.00 for <br />Landscaping. As noted in the Wetland enhancement packaqe, dated <br />August 7, 1991 a aecond assurance bond ie to be iasued for <br />$1,280.00, which was signed by Water Reaourcea Section, Snohomiah <br />County Planning Department. ToL•al amount required will be <br />$2,662.00. <br />NOTEs <br />The assurance bond total is for both the Wetland <br />the landscape enhancement. However, this report <br />Landscape costs. See wetland enhancement report <br />1991 for details on the wetland. <br />Reed Holtgeerts, Owner <br />enhancement and <br />only liata the <br />dated August 7, <br />