Laserfiche WebLink
S!ep 2D DETERM/NE hfETHOD OFSTREA,tf BAn'K EROSIONCONTROL. <br />I3ascd upon rcview of the strcambank erosion control DMPs described in the Stormwater <br />Ma.agement Manual, as well as discussions with City stuff, streambank erosion control <br />will be �rovided by live storage in thc aforementioned detention pipe. <br />Step 2E) DETERMINE BMP SEQUENCE. <br />As shown on the construction pinns, runoff will be conv:yed in a storm drain pipc system <br />to a derention pipe system The pipc system will provide 3-fect of dend storage for 85 <br />percent of the volume of dead storage required for runoff treatment. The remaining 15 <br />percent of required runoff treatment volume will be provided in the vegetated trcetment <br />cell located at the outfall from the deten�ion pipe system. The detention pipe will also <br />provide live storage for the requircd strcambank crosion control volume. <br />