My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1910 112TH ST SW RIVERSTONE SITE DEV 2016-01-01 MF Import
>
Address Records
>
112TH ST SW
>
1910
>
RIVERSTONE SITE DEV
>
1910 112TH ST SW RIVERSTONE SITE DEV 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 2:23:38 PM
Creation date
4/14/2017 8:30:28 PM
Metadata
Fields
Template:
Address Document
Street Name
112TH ST SW
Street Number
1910
Tenant Name
RIVERSTONE SITE DEV
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
No. 11 — Wetponds <br />Maintonanco Defoct Condition When Maintenanco Resulls Ezpected When Maintenance is <br />Componont le Noadod t`oriormad <br />General Woter lovel Firsl cell is empty, doesn � hold Line Ihe firsi ca�l to maint.iin et least 4 toel <br />watec of waler. Allhough Iho second cell may <br />drein, Ihe first cell must remain full lo <br />control turbulence of the incoming flow <br />and roduc3 sedimant resusponsion. <br />Tr�sh and Acaimulation Ihal exceeds 1 Tresh and debris remov�d (rom pond. <br />Debris CF per 1000-SF ol pond area. <br />InIeUOullrt InIeV0u11�1 pipe clogged wilh No clogging or blockago in Qie iMet and <br />Pipe sodiment anA/or debris malerial. oullet piping. <br />Sediment Sedimenl accumulalions In Sedimen� removed frem pond boUom. <br />Acewnulation pond boltom lhat ezceeds Ihe <br />in Pond deplh ol sedimenl zone ptus & <br />Bollam inches, usual�y in Iho first cell. <br />Oil Sh��en on Prevalent anA visiblo oil sheen. Oil removed trom water using dl- <br />Waler absorbenl pads or vaclo• tr�ick. Sourco of <br />oil loca�ed and corredod. If chroaic low <br />levels ol oil persisl, plant wnlland ptan�s <br />such As Juncus eftusus (sofl r�sh) which <br />can uptaV;e small concentratinns of oil. <br />Erosirni Erosion of Ihr, pond's sidc Slopes s�ebilized using proper �rosion <br />slopes and/or scourinc� of Ihe control moasures end repalr mc ihocis. <br />poncl bottom, Ihal oxceeds 6- <br />Inches, or wh�re conlinued <br />erosion is prevalent. <br />Seltlemnnt ol Any part ol lheso componenls L�ikelborm is repaired to spocifications. <br />Pond Ihal hns sell�od 4-Inchas or <br />Dike/6emi lowor Ihan the design elovation, <br />or inspedor determines <br />dikeNerm is unsound. <br />IN�mai Berm Berm dividing cells should ba Borm sudaco is leveted so lhat water <br />IevaL (lows evenly ovor enlire length of borm. <br />Overflow Ror.k is missing and soil fs Rocks replaced to specificalions. <br />Spillway exposod al top ol spillway or <br />aulsidn slope. <br />4-42 Volunre V— Runoll Treafinent QMPs Augusf 2001 <br />C� / <br />
The URL can be used to link to this page
Your browser does not support the video tag.