Laserfiche WebLink
COMPVANCE <br />REOUI'�D � <br />INSPECTION IMPORTANT: Please au I Inlormetion In tho shnded boxes end check the opproprlate <br />APPROVED� PP Y <br />clrcles. Dlsre�ard topics that don't descrlbe your bulldinp or equlpment. pD�1DI place <br />checks In the two Ieft columns. <br />❑ ❑ Q EMerlor slab Insuletlon, il nof located or. the Intorior, shali be R•10 (Table 6-2). <br />� � Qi Exterlor slab Insulatlon, rl pn�sent, shall approved lor below grade use and protected above grade. <br />❑(z�e Wails, including rim joists, shall be insulatod without compression to (Tablo 6-2); <br />�R•15 bari (Options i,ll} �R-19 (Option III, IV, U, VI, Vlq <br />❑�Intetlor below gratle walls shall b insuiated without comprossion tn (Tablo 8•2): <br />(�R•15 (Oplions I, Ip �-19 {Opifons III, IV, V. YI, VII) <br />❑ ❑ Qo VauNed cellings shall be insulated without compression to R�30 (Table &2, !VI oplions) <br />❑ I I❑ IQi SkyllAht wall Insulatlon is insta�led and equivaient to the required wali R•values above. <br />❑ Q Vepor retarders shall be Installed toward the warm eurtace as represented below (502.1.6j <br />Seiect one optior� tor Iloors, walls, end approprlato coiiinqs: <br />Floors: �Pl�wood W/ exterior glue � Poly (a a Mlq 0 Backed baris <br />Walls: Poly plasiie (� 4 Mil) Q�Face-stopieci, backed bntis (� PVh pnint <br />Coilings; Not required where ventilation spaco averages >12" above insuialion. <br />Puce stapled bached batt� QPoly piaslic (a. 4 mii) �PVA paint <br />� ❑�Heating systom altk:lency and sizing roquirements shall be niet ae represnnted bolc� : <br />❑ ❑ Heat Pump efflclenr;y shall bo mot undor tho tollowing comal;anco path{5. 503.4): <br />� Spllt system, :,ir source heat pump: HSPF z 6.8, COP � 3.0 <br />� Singlo padcaaa, air suurce heat pump: HSPF a 6.6, COP > 3.0 <br />Q Watar sourr,e hoat pump: COP a 3.8 � , �- <br />� Ground souroo heat pump COPa 3A <br />n <br />� <br />p Q Central (orce�air furnace AFUE raling, as listad in the GAMA Direclory, shall be: <br />�z .72 �Opttons I, Ii, IV, VI, Vlq ��.88 (Option III)) �a.74 t�PUon V) <br />❑ s N �centr i, combustion heating systems shail have intormitent ignition <br />❑�Maximum heating system output (150%of dosign heai load) is. � o R71JAx. (5.503.2.2) <br />❑ e High elflclency forced•ai� fumace (s 56,000 BTU/hr. uulput)may may exceed 150°'�of OHL <br />because: (,�GAM� lisled AFUE is z 78 + 1 per each SODO f3TUlhr output Ihat il oxCeeds the DHL. <br />WSEC Insulatlon phase raqulrements: <br />Inspected by — <br />❑,y Envelope Floars shall be insulated wiihout comprossion, and with support s <br />�19 (Option, I, II, III, IV, V) Q R2� (Oplions VI, VII) <br />p �o Non•vaultod, attic celiings shall be Insulatod without comprosslon lo: <br />{L-lfa•30 (Opdons i, II, III IV, V, Vlp � R34 (Optlon Vq <br />❑>> Ooor syslems shall meet�(�UAO (�II options) <br />poor typos are (y )_.._.._.___._ _...__..._.._(2).._____._ _ _�.___.. _..__ (�1�.........__ <br />za° o.c. to: <br />CSea Table 6-2 <br />_.._ .._.-__.. <br />Pope 5 0( G <br />