Laserfiche WebLink
COMPLIANCG <br />flEOUIREO � <br />INSFECTION <br />APPROVED <br />�❑ ❑ <br />r] p <br />❑ ❑ <br />` 79pU1 St71.tt�03 L77'# <br />IMPORTANT: Supply Informntlon In the shaded area by checking ihe approprlate circles. <br />D!sreAarcf topics that don't descrlba your trullding or aquipment. DO NOT p�a� checks In <br />the two leit columns. <br />FOUNDA�'/OIH;P,1l�QSE;��z��a I <br />) Slab Insul� ;,;,, (Tabie 6•2) shall be R-10 and located on Ihe: <br />OA. £xtedor (Sea INSULl�TION INSPECTION). <br />OR <br />QB. lnlerlor e��nding downward frem the lop siab suAaCe lo Its und�rsurfaCo and <br />horizontally under 1ho slab (or a total distznco ol 24`, or�iorticaify 24'. <br />Radlant Slob insulatioh (S. 502,1,4 aJ sliall bo Fi•t0 and oxtond undor tho entlro slab <br />Below grado masonry wall fnsulation {S. 502.1.4.10) shali ba tuil-dopih and located on the; <br />Q4. EatoNor and fat�d R-10 (Soe INSULATION PHASE�. <br />OR <br />QB. Inter;cr (Sea INSULATION FNqSE) <br />❑ ❑ LJ Thertnal break(s) shali be placed i� iye siab (S. 502.�.a.8, 201.1: L3UILDING ENVEI.OP�) <br />betweon the condition�d ar�d unconditioned spacas chockod below, nnd extend from the top of tho <br />slab !o tho botiom, lhen undernealh towar4 the conditionod space tor a 24", <br />Q d•NelBnglgarage � c)�yellinp/connected space � sla� od}7e and foundalion wall. <br />❑ ❑ sQ Redon Requlrements (VIAQ, S. 5D2.1) shall be met II QnG of the foilowiny ts chocked: <br />Q A. Net loundation vunfilatioh area is less thon 1 FT2 per 30D F12 0l crdwl epaco <br />Q B. Foundation venis aro closablo. <br />Q C. Crawl spaca acts as a suppiy, or relum alr plenum. . <br />WSEC Foundatlon phase requirements: <br />Inspected by: <br />° FR�IMING PHAS�' '' <br />'_:,; <br />� <br />❑ e All structuret panels such as plywood, oriertted strand board, parliclo boanl, and wafer board shall be <br />labled ^EXpOSURE I", "EXTERIOR", or `HUD-APPROVED'. (VIAQ, S. 401.1) <br />❑� Insulatlon baflles shall be piaced in attics/ceilings to maintafn at least 1"ventllation space and extQnd at <br />Ieast 6" vurtically above batts or 12" verlically abovQ looselill insulation (S. 502.1.4.5). <br />�7 QGlnzing otliclency ro d undor Itie eeloclod option shall be {S. 502.1.5, G02.7.2, Table G-2): <br />s U.70 (Op11on I) s U.65 {Oplions il, IV) �, U.75 !OpUon ili j <br />U.60 (Oplion V) s U.50 (Op;ion VI) �; U.4, (Oplion Vil; <br />Symbols used: � equa/a s preeter fhan e loes fhan Z Brcatar than ore uel ` <br />9 slesa thm�oreqUei <br />UP�ATEDSEPTEMBERIBGI <br />Page 2 of G <br />