My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25 115TH ST SE 2016-01-01 MF Import
>
Address Records
>
115TH ST SE
>
25
>
25 115TH ST SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 1:05:28 PM
Creation date
4/14/2017 9:02:08 PM
Metadata
Fields
Template:
Address Document
Street Name
115TH ST SE
Street Number
25
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PI.�BLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved plan dated _ <br />5. Connect side sewer per City Standard #601. <br />� Connect side sewer per City Slandard #'s 60' , 602, 604. <br />7. Connect ali rooftop downspouls to the side sewer. <br />((8. ) Connect rooftop downspouts to the drainage system provided for this 'ot. <br />l/ <br />9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br />Storm Manual 3-2.6.2. Width _, Depth _, Length � <br />10. The contractor must meel with the Public Works Inspector to discuss potenlial drainage <br />routing prior to beginning the project. <br />11. Install erosion :,ontrol measures as determined by the Public Works inspector, such as silt <br />fence, straw bales, swales, or erosion blankets. <br />12. Install erosion conlrol measures per City o( Everett Standards for small parcels <br />13. Remove erosion control measures upon completi�n of the project prior to final approvai of the <br />permit. <br />�%14�A11 excavated material from foundation, sidewalk and driveways shall be hauled to an <br />� approved, permitted site. No wasting of material is allowed on this building lot. <br />15. Remove and replace �urb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br />& 306 on lhis proposal's frontage as directed by the Public Works Inspecror (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />16. Install a Type I concrete driveway per Ciry oF Everett Standard #307. <br />17. Pave driveway irom the front property line out to the street paving. <br />18. Contact the Water District for connecting provisions for this building's <br />water and sewer services. <br />19. A catch basin as per City Standard Plan iW02 with a gas irap per Standard Plan #410 is <br />required for the parking area. <br />20. If a sewer pump system is to be installed, the �. essure line must discharge into a private <br />manhole, then gravity flow across the public rght-of-way. <br />21. A sprinkler system is required for this building in compliance with the requiremenls of NFDA <br />Standards 13D. <br />P�,:cmmer;s I 7�/� I <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.