My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
27 115TH ST SE 2016-01-01 MF Import
>
Address Records
>
115TH ST SE
>
27
>
27 115TH ST SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 1:04:54 PM
Creation date
4/14/2017 9:02:36 PM
Metadata
Fields
Template:
Address Document
Street Name
115TH ST SE
Street Number
27
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMMENTS <br />4. As per Public Works approved plan dated <br />5. Connect side sewer per City Standard #601. <br />;'6. Connect side sewer pe, City Standard #'s 601, 602, 604. <br />7. Connect ail rooftoa downspouts to the side sewer. <br />��onnect rooftrp downspouts to the drainage system provided for this lot. <br />9. Aooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br />Storm Manual 3•2.6.2. Width _, Depth _, Length _. <br />10. The contractor must meet with tlie Public Works Inspector to discuss potential drainage <br />routing prior to beginniny the project. <br />11� fnstall erosion control measures as determined by the Public Works inspector, such as silt <br />fence, straw bales, swales, or erosion blankets. <br />12. Install erosion control measures per Ciry of Everett Standards for small pa�cels <br />, 13; Remove erosion control measures upon completion of the project prior to final approval of the <br />' permit. <br />�4. All excavated material from foundation, sidewalk and driveways shall be hauled to an <br />approved, permitted site. No wasting of material is allowed on this building lot. <br />15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br />& 306 on this proposal's frontage as directed by the Publi� Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />16. Install a Type I concrete driveway per City of Everett Standard #307. <br />17. Pave driveway from the front property line out to the street paving. <br />18. Contact the Water District for connecting provisions for this buildinc�'s <br />water and sewer services. <br />19. A catch basin as per City Standard Plan #402 with a yas trap per Standard Plan #410 is <br />required for the parking area. <br />20. It a sewer pump system �s to be installed, the pressure line must discharge into a private <br />manhole, then gravity ilow across the public right•of-way. <br />21. A sprinkler system is required for this building in compliance with the requirements ol NFDA <br />5:andards 1?D. <br />P�VGommeni5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.