Laserfiche WebLink
PUBLIC WORKS PERMIT COMMENTS <br />d. As per Public Works epproved plan dated <br />5. Connect side sewer per City Standard #601. <br />� Connect side sewer per City Standard #'s 601, 602, 604. <br />7. Connect all rooftop downspouts to the s�de sewer. <br />� Connect rooftop downspouts to ihe drainage system pro•�ided for this lot. <br />9. Rooftop runoff must be discharged to a root down���ut infiltration system per City of Everett <br />Storm Manual 3-2.6.2. Width _, Depth _, Length _. <br />10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br />routing prior to beginning the project. <br />� 11� Install erosion control measures as determined by the Public Works inspector, such as silt <br />fence, straw b..�es, swales, or erosion blankets. <br />12. Install erosion control measures per Ciry of Everett Standards for small parcels <br />__ <br />13�Remove erosion control measures upon completion oi the project prior to final approval of the <br />permit. <br />14. All excavated material from foundation, sidewalk and driveways shall be hauled to an <br />approved, permitted site. No wasting o( material ;� allowed on this building lot. <br />15. Remove and replace curb, gutter and sidewalk as per City ot Everett Standard Plan #'s 305A <br />& 300 on this proposal's irontage as directed by the Public Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be repiaced). <br />16. Install a Type I concrete driveway per City of Everett Standard k307. <br />17. Pave driveway from the front property line out to the street paving. <br />18. Contact the __ Water District tor connecting provisions for this building's <br />water and sewer services. <br />19. A catch bas n as per City Standa!d Plan #402 with a gas trap per Standard Pla� Jt410 is <br />required for the parking area. <br />20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br />manhele, then aravity ilow across the public right-of-way. <br />21. A sprinkler system is required for this building in compliance with the requirements of NFDA <br />Standards 13D <br />..c_�T—.esis <br />