My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2216 116TH ST SE 2016-01-01 MF Import
>
Address Records
>
116TH ST SE
>
2216
>
2216 116TH ST SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 12:50:00 PM
Creation date
4/14/2017 9:11:18 PM
Metadata
Fields
Template:
Address Document
Street Name
116TH ST SE
Street Number
2216
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMMENTS <br />4. Contacl ihe Public Works Inspector (call ) to di:,cuss the projecl prior !o beginning work. <br />q, Connect side sewer per City Standard #&01. <br />5. Connect side sewer per City Standard #'s 601, 602, 604. <br />g. Connect all rooftop downspouts to the side sewer. <br />7. Connect rooftop downspouts to the drainage syslem provided for this lot. <br />g. Rooflop runoff must be discharged tc a roof dov.�ns�out infiltration system per City oi Everett <br />Storm Manual 3-2.62. The approximate size trench is 3.5' wide, 2' deep and 25' long. See <br />attachment for more delails. <br />g. The contractor must meet with ihe Public Works Inspector to discuss polential drainage ro�ting <br />prior to beginning the project. <br />10. Install erosion contrel measures as determined by the Public Works inspector, such as silt fence, <br />straw bales, swales, or e��sion bla��kets. <br />� <br />/�-1i. � Install erosion control measurss per City of Everett Standards for smail parce s <br /><< h ' cl rior to tinal approval ot lhe <br />Remove erosion control measures upon completion of t e pro�e p <br />permit. <br />All ezcavated material (rom toundation, sidewalk and d•iveways shall be hauletl to an approved, <br />permitted site. No wasting of malerial is a�lowed on tF,,. ouilding lol. <br />No dirt, mud, rocks or debris to be tracked unto roadway. <br />No building materials to be slacked on sidewalk/roadway and sidewalk/roadway to be kept clean <br />and open for pedestrian travel. <br />Adjust water me;er box 1" above sidewalk grade. <br />� 7. Removs and replace curb, gutter and side�valk as par City oi Everett Standard Plan #'s 305A 8 <br />306 on th�s proposal's trontage as directed by the Pubiic Works Inspector (i.e. all unused <br />driveways and any broken or damaged area must be replaced). <br />18. Install a Type I concrete driveway per City of Everett Standard #3D7. <br />1 g. Pave driveway from the L �nt pmperty line out to the streel paving. <br />20. Contact the Water District for connecting provisions for this building's water <br />and sewer services. <br />21 <br />22 <br />A catch basin as per City Standard Plan t1402 with a gas trap per Standard Plan N410 is required <br />(or the parking area. <br />If a sewer pump system is to be installed, the pressure line must discharge inlo a private <br />manhole, then graviry tlow across the public righbot•way. <br />
The URL can be used to link to this page
Your browser does not support the video tag.