Laserfiche WebLink
l <br />CLOSED CM WORK ORDERS REPORT <br />Total l�tility Maintenance Management System <br />06/13/1995 Page 1 <br />------------------ ----------------------_----_--__________________'_-___�_"_____ <br />Date Range :O1/09,'1989 - 06/OG/1995 <br />CM Work Order Range :1001091070001 '- UT2G08- - Pattern :7101196750236 <br />Item Range :<Blanl:> - WW22020001 Pattern :* <br />Program ALL Function ALL Activity ALL <br />-------------------------------------------------------------------------------- <br />CM WORK ORDER ID: 71J119675023G Title: R1:NEW 2016 120TH PL SE <br />�::DUPLICATE PRINTINU OF THIS WORK ORDER» <br />Ttem ID: WS2985E005 -- WATER SERVICE <br />Location ID: -- <br />Program 710 Function 119 Activity 675 <br />Date ComNleted: OG/06/1995 <br />Overall Craft: <br />Issued: 06/O1/1995 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Lahor: <br />Craft ID <br />DL LMA <br />WST TDE1 <br />Materials: <br />ID <br />ADAP3400044� <br />ADAP34000547 <br />ADAP34000647 <br />BOX000065547 <br />CORP36002247 <br />COUP36147547 <br />METE34141847 <br />PIPE14060647 <br />SADD44017047 <br />SETT34033647 <br />Vehicles: <br />in <br />V2119 <br />V2146 <br />VH0003 <br />VT0007 <br />Name <br />Issued by: JSM Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />GIBBING, MAURICE R <br />J'HOMPSON, DWAYNE c.. <br />Description <br />------- --------------------- <br />ADAPTER 3/4" IPS UNION ZNSTA @ <br />ADAPTER 3/4" MIP X INSTA-TITE@ <br />ADAPTER 3/4" FIP X IN�TA-TITE@ <br />BOX METER CONC W/;TEEL LID <br />CORP STOP 1" CCT X INSTA-TITE@ <br />COUPLING 1" CTN X 3/4" MIP @ <br />METER 5/8" '; 3/4" NEPTUNE <br />PIPE 3/4" POLY I.P.S. <br />SERVICE SADDLE 6" W/1" CCT <br />SETTER COP 5/8" X 3/4" LGTH15" <br />Planned Hrs Actual Hrs Cost <br />0.00 13.00 192.79 <br />0.00 J3.00 212.55 <br />Total Labor Cost: 405.34 <br />Date <br />06/06/1995 <br />06/06/1995 <br />06/06/1995 <br />OG/06/1995 <br />OG/06/1995 <br />OG/06/1995 <br />06/OG/1995 <br />06/06/1995 <br />06/OG/1995 <br />06/06/1995 <br />�r Used <br />1 <br />7. <br />1 <br />1 <br />1 <br />1 <br />1 <br />38 <br />1 <br />1 <br />Total Material Cost: <br />Description Hours <br />91 CHEV 5 YD 5.00 <br />87 CHEV 1 TON W/HYD. UNIT 5.00 <br />94 CAT BACKHOE 5.00 <br />94 ATLr.S COMPCO COMP. 5.00 <br />Total Vehicle Cost: <br />Cost <br />56.50 <br />25.50 <br />138.00 <br />36.00 <br />i:l.Y'�[�I�l <br />Cost <br />8.27 <br />7.95 <br />7.26 <br />33.38 <br />25.15 <br />6.79 <br />A5.73 <br />9.88 <br />11.58 <br />48.46 <br />249.45 <br />