Laserfiche WebLink
• October through January 1988 - engmeering plans, bnilding permit; and <br />• March and April 1989 - consuuction of project and construction of mitigation <br />area <br />Mon[torin� <br />A monitoring contractor will be responsible for monitoring earthwork activities along <br />Silver Lake Creek aad around t6e e�tisting pond area to insure t6at proper measures are <br />employed to avotd impacts to existing riparian vegetadon and to d'vect the transplanting of <br />trees and shrubs. The contractor will also be responsible tor insuring thxt proper building <br />se:hacks from t6e wetland and pond are accomplished. A monitoring report will be <br />subnutted to We City of Everett <br />14 <br />