My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1720 121ST ST SE 2016-01-01 MF Import
>
Address Records
>
121ST ST SE
>
1720
>
1720 121ST ST SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 8:40:04 AM
Creation date
4/14/2017 10:00:17 PM
Metadata
Fields
Template:
Address Document
Street Name
121ST ST SE
Street Number
1720
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
227
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CASCADE GEOTECHNICAL <br />i March 9, ?989 <br />i Job No. 892-22G <br />Gustavson Construction <br />; Page 6 <br />eight (8) inch ductile iron water main may be located within the <br />roadway. <br />IFill scttlement loacis on a pile supported pipe would be likely to <br />damage the main. The main should be equipped with flexible <br />Icouplings and "crowned" to avoid separaticn if placed in the fill <br />at the time of construction. <br />IGeneral <br />� i IIt must be realized that sectlement of the pcoposed roadway is <br />;,I expected if it is placed over the peat, and periodic pavemunt <br />' repairs are anticipated throughout the lifetime of the roadway. <br />The recommendations presented in this report are intended only to <br />� mitigate roadway settlement and distress. <br />IWe recommend that we be engaged to review plans as they are <br />prepared and observe subgrade preparation and proof rolling and <br />I observe and test the compaction of structural fill. <br />1 <br />I We expect the on-site soils to reflect aur findings; however, vari- <br />ations may occur. Should soil conditions be encountered that cause <br />I concern, and/or are not discussed herein, we should be contacted <br />immediately to determine if additional or alternate recommendations <br />a=e required. <br />1 <br />This report has been prepaced for the exclusive use of Gustavson <br />JConstruction for specific application to the proposed short plat on <br />Silver Lake Road in Everett, Washington in accordance with general- <br />I ly accepted soil and foundation engineering pcactices. No other <br />warranty, expressed or implied, is made. <br />
The URL can be used to link to this page
Your browser does not support the video tag.