Laserfiche WebLink
� <br />� Dccember 15 1992 9 923-1184 <br />� In areas whcre the existing (ills and peats arc Icfl in placc, we remnunend Ihe following: <br />• Preload/Surchar�e: The remmmendations presenled in Section 5.G should be <br />� implemmiled and will minimize post conslruction selUemenl. <br />• Subgrade SupporL• The intent of our remnunendations is to provide a <br />� subgradc capablc of supportin� a loaded dump truck wilh limiled ground <br />disturbance prior lo placing Ihe design pavement seclion (asphall and <br />grave�rock subbase. Seclion 5.G provides conslniclion recommendalions for <br />� meeting Ihis perfonnance criteria. During dry wealher, lhis can probably be <br />accomplished though a combinalion of proof-rolling, subgradc compaction and <br />localized over-excavalion o( so(l areas. In areas whem the rcquimd re,ise in <br />� grade is more than about 2(eGf,_minimal subgrede preparalion is mquired <br />since lhe netv f'I should br. ids;c aiiy sofl arcas. <br />� 5.4 Utililics <br />� In arcas whcre the cxisting loose fills and peal arc removed, arc o( limiled deplh, or do not <br />exist, the ulililies can ba designed and constructed in a normal mannec Il may be prudenl lo <br />locate lhe major deep truck lines such as waterand sewer in areas o( limiled unsuitable soils <br />� and simply oververcavale in Ihe trenches and place lhe ulility on grevel backfdl over till. <br />Depending on Utie local pennilling a�encies, il may be a requiremenl lo place these main <br />ulililies on competenl ground. <br />� Ulililics, parlicularly thc on-site lines, can bc fowided in the exisling fill or lhc pcat provided <br />lhe preluad/sulcharge recommendalions presented in Section 5.G have been implemenled in <br />advancc of Ilic utility installalion. Any sofl, unsuilable soil exposed at lhe boUom of ulility' <br />� trenclies slioiild bc over-excavaled to a minimum deplh of t}velve-inches below design inverl <br />and replaced with strucluraf fill or pea grevel. If lhe deplh lo Ihe bollom of Ihe peat is less <br />ihan about hvo feet, it is proUably prudent to ovcr-excavalc anyway. Prior to lhe placemenl <br />� of the fill or pea gravel on soft soils, it may be prudenl lo �lace a.geolextile separation (abric <br />on the botlom and sides of thc excavation if lhc ground is unslable. <br />� In arcas tvhere lhe utilily will be undcrlain by pcat, wc recommend Ihal flexible joinls and <br />cut-ouls be provided tvhcre lhe ulililies enier thc pilc supported buildings. h� addilion, all <br />ulilily installalions should salisfy the rcquiremenls of the local governing agencies. <br />� Utility trench excavalions below the groundwaler fable will probably encounler cavin� <br />condilions and will require temporary shorin�; or a Irench box lo mainlain sidewall slabilily. <br />� Dewatering of lhe excavalions can probably be accoiuplished �vith sump pumps. <br />� <br />� Golder Assoeiales <br />