Laserfiche WebLink
and Ufilitiea Policies) <br />9. Phas� I- A minimum of 10 percent of the site must be provided in usable <br />rea�atlon spaoe. Landscaping in tha parkmp aroas and tandscaping in <br />sdbadca whero landscape screeniny is required shall not be counted in meeting <br />thia atendard. Recreation tacilities must be provided for a ranye of age proups. <br />A minimum of one tot lot ia requirod. Tot lots must be IocateC in central areas, <br />where adequata supervision of children can be providad. <br />As part of the building pertnit applicadon, the Applicant must submit a reueation <br />plan inGudinp standarda and specificetiona for recreatlon areas end equipment, <br />both inaide and outsids the building, inGudiny picturoa ot proposed equipment. <br />If sufficisnt infortnation is nat known at time of submittal for building pertnits, <br />minimum apedfications or examplea muat be provided. P�ior to tha issuance of <br />Buildinq pertnits, tha Planning Department must approve a plan for on-site <br />recreadon faalitles. (SEPA Public Services and Utllitiea Policies) <br />9. Phas� I- Scroeninfl of all refuse disposal areas, includiny reryGinq areaa, must <br />be provided. The loc.ation oi refuse dispoaal aroas must be shown on the site <br />plans aubmitted for buildinp pertnits. (SEPA Land and Shoreline Use Policies) <br />10. Prior to issuencs of any pertnits, IandscapinQ plans muat be reviewed and <br />approved by the Planninp Department. The landscapinq plan must show <br />location of roquired vepetated swales, rockeriea and retaininy welis, and prading <br />at 2 toot intenala. The wetland and buffer plantlnpe may be incorporated into <br />the landscaping plan Ior the site, or in a separete plan. Irtipation systems muat <br />be provided in all landscaped areaa. (SEPA Land and Shoroline Use Policies) <br />11 All exterior Iights shall be directed dovmward onto the sita and away from <br />adjacent properties. (SEPA Land and Shoroline Use Polides) <br />12. All necessary erosion control measurea must be utllized and maintained to <br />ensure sediments stey on site and do not enter Uie Silver Lake/North Creek <br />drainaQe system. An erosion and sedimentation control plan must be reviewed <br />and approved by ths Public Worka Department prior to iaauance of any pertnits. <br />(SEPA Earth and Water Poliaea) <br />�3�% Per Ciry polidee, due to ths proximity ot the site to environmentaily sensitive <br />areas, aeasonal limitatlona will bs placad on land altsratlon adivitlea. Land <br />alteraYon activitiea aro defined in the Ciry'a Deaian and Construction Standards <br />and So�cillcatia�s as dearinq, yrubbiny, ezcavatlon, filliny, pradinp, and <br />•tpdcpHinp. Determinatlon of the exact seasonal IimRation period requires site <br />�p�,Mk infortn�tlon penerally not available until the project desiqn staqe. <br />HowwK, prolimin�ry analysia usiny tho infortnaUon availabl� at this time <br />indc�Mt fhat land allerallon activities on the project site will be resUtcted to the <br />perlod b�tvvsen AprN 1 and October 1. (SEPA Water and Plant and Animal <br />Polidea) <br />�t�.' Development of fhs aite muat not adverosly affect ths hydroloyy of the site's <br />waUands. It is important that the hydropariad for ths wstlanda not be aRerod to <br />the poiM that major speGes chanpaa will orcur. The qwntity and rats of water <br />entarinp the wetlands must be detertnined for wrt�ent conditi�n�. Under <br />devslopsd conditlons, a similar rate and quantlty of roof drainaQe or troated <br />runoif muat continue to be discharyed to the wstland(s). Calculadana showinq <br />