My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1600 121ST ST SE 2016-01-01 MF Import
>
Address Records
>
121ST ST SE
>
1600
>
1600 121ST ST SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 10:56:45 AM
Creation date
4/14/2017 10:16:29 PM
Metadata
Fields
Template:
Address Document
Street Name
121ST ST SE
Street Number
1600
Imported From Microfiche
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1894
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Casper Creek Townhouses <br />2/04/93 <br />Revised 6/04/93 <br />BASIN "B" ANALYSIS <br />R/D Analysis & Design <br />II. DEVELOPED SITE CONDITIONS <br />b. Bypass Area = 1.20 acres <br />88•4555 <br />CRO <br />A portion of the pervious area currently located in existing easin "B" will <br />bypass the proposed detention facility (see Developed Basin Map). <br />CN Vatue <br />Impervious Area = 0.45 <br />C'Nimpervious ' 98 <br />(Rooftops - Buidlings 11•15) <br />Pervious Area = 0.75 acres <br />CNo�ry�o�9 = 87.60 <br />T(me ot Concentration <br />The developed time of concentration travel path oi the bypass area consists <br />of 90 lineal feet of sheet flow over undeveloped area at 15.50 percent, 350 <br />feet of channel in undeveloped wetland area at 3.0 percent, 319 lineal feet <br />of channel flow in concrete pipe at 0.5 percent and 200 lineal feet of <br />channel flow in undeveloped wetland area at 0.5 percent. The time of <br />concentration was calculated within the computer program "WaterWorks <br />Version 2" to be 29.89 minutes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.