Laserfiche WebLink
�U�/C `l/O/�K5 * <br />June 10, 1996 <br />Schneider Homes <br />Attn: Carl Bloss <br />6510 Southcenter Blvd <br />Tukwila WA 98188 <br />SUBJECT: Phase III of Casper Mill <br />Dear Carl, <br />Following are the fees for the Phase IIZ portion of the <br />Casper Mill project: <br />Building Permits <br />Traffic Mitiqation <br />(30 units x 1425.825) <br />Systems Development <br />(30 units x 8�4) <br />Sewer permits <br />(5 bldqs x 70) <br />Water �� <br />(5 bldgs x 260) <br />_� - �/r 0 <br />� . /,a pJ TOTAL <br />� �� <br />10,5G9.40 <br />42,774.75 <br />25,010.00 <br />350.00 <br />1 0.00 <br />8 0_'-va � . ►5 <br />r�a,C)�� , '."_ <br />, .. <br />i <br />1�,-1'%�. /J <br />A letter or receipt from the school district acknowledqing <br />payment of their fees is also required. <br />Please call me at 259-8810 if you have any questions. <br />Sincerely, <br />Mollie Hughes <br />euilding Division <br />C TY OF tVERE7T• 3200 Ced2r Sireet • Everett, WA 98201 •(206) 259-8800 • Fax ;206) 259-8856 <br />