Laserfiche WebLink
SHCiiELINE STABILIZATION PND FLOOD PROTECTION <br />INTRODUCTION <br />Flood protection and streamxay modificationa are thaee activitiea <br />ocaurring xithin the etreamxay and wetland areaa which are deaigned <br />to reduce overbank floM of high aatera and stabilize eroding stream- <br />banka. Reductian of flood damage, bank atabilization to reduce <br />sedimentation� and protection of property from eroaion are normally <br />achieved through waterahed and flood plain management and by <br />structural works. Such meaeures are often complementary to one <br />another and several meaauree together may be neceaeary to aehieve <br />the desired end. Unleae carefully deaigned and located, atructural <br />measurea can hava a potentially adveree impact on the overall <br />hydraulic operation oT the atreamway corridor. <br />POLICIES <br />1. Locate, design and conatruct riprapping and other bank etabilizatior <br />or flood protection meaaurea ao aa to avoid channelization, pro- <br />tect adjacent property from adverae etfecta and to protect the <br />natural character of the etreamway, <br />2. Place all flood protection meaaurea euch aa dikea and leveee <br />landxard of tha principal atreamxay, including aaaociated <br />awampe and marahes directly interrelated and interdependent with <br />the eLream proper. <br />3. Recognize and protect the integrity af a water body'a hydraulic <br />ayatem Mhen planning for and deeigning ahor-eline �tabilization <br />and fiaod protection meaauree. <br />RE6ULATION3 <br />General <br />1. Al1 ahoreline etabilizaCion as�d flood protection meaeuree ehall <br />be deaigned and conetructed eo that do�matream banke xill not be <br />adveraely etfeeted. <br />ShQreline etabilization and fload protection meaauree ehall not <br />be deaigned and conetructed in euch a manner aa to reault in <br />channelization of normal atream flowe. <br />3• All applications for ahoreline etabilization and flood protection <br />meaeurea ahall include the folloWing (at a minimum): <br />a. Purpoee of pro�ect; <br />b. Hydraulic characteristica of river within one-half mile on <br />each aide of proposed pro�ect; <br />EXHIII[..�.-- <br />F-6• . '!�, <br />p �� Ot� <br />