My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1600 121ST ST SE 2016-01-01 MF Import
>
Address Records
>
121ST ST SE
>
1600
>
1600 121ST ST SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 10:56:45 AM
Creation date
4/14/2017 10:16:29 PM
Metadata
Fields
Template:
Address Document
Street Name
121ST ST SE
Street Number
1600
Imported From Microfiche
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1894
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
530.00, City of Everett datum. All sUu,:tures should be constructed at least two <br />fs�t above fhs 100 yoar flood elevation. The sito is not deaipnated as beiny <br />within �M flood Mnpe district. However, tha City recommends compliance with <br />tM 11ood MnQe devalopment standards. <br />Section 30.040.C. of the Zoninp Code lists the followinq development standards <br />/or usef in fhs urban and rural flood hinpe disMcts. <br />a. The first floor of sWcturea and outdoor storape areas shall be hvo (2) <br />feet above the repulatory flood protecflon elevadon. <br />b. Tha elevatlon of the site shall be two (2) feet above the regulatory flood <br />protection elevatlon for a distence of fifteen (15) feet beyond any <br />structurs in any direcNon. <br />c All parking areas and driveways shall be no lower than one (1) foot <br />bolow the requlatory flood protection elevatlon. <br />d. Compliance with Federal RepulaUons Title 44 CFR Part 80.3 and <br />Subaecxion 30.050 of this Ordinance is requirod. <br />B. The Snohomiah Counly PUD currently has sutfiaent capadty to seroe fhe <br />proposed development. For infortnation about ths elecUical servica <br />requiremenb for this projed, pleaae call Dawnell Howard oi the Distrid'a <br />Customer Enpineerinp Office, Everett, at 258-829�. <br />9. GTE Northweat Incorporeted will provide servics to the sita. However, new <br />telephons cabls conaWction will be requirod in conjunction with the ske <br />development GTE's enyineerinp will beqin whan they are notified of your <br />consWctiart schadules and telephona requiromenta. <br />10. <br />11 <br />It will be the Qevelopers responaibility to provide a suitable combinaton of <br />conduit and Venchiny and/or riser conduit to accommodate GTE's n�twork <br />communicaUons cable within ths complez. Provided that an accaptable <br />combinaUon oi conduit and/or trenchinp are incorporated into ths project to <br />accammodate GTE'a entrance cable, thero will be no coats to the developer for <br />GTE's cable. <br />If a rearranpement of existlnp cables on promiae or on che riyht-oi-way ia <br />necessary, approprfab charyes will bs eatlmated and GTE's Guaranry at <br />Payment fortn will be forvvarded to you for your siyneturs. Prior to <br />comrtwnosmertt of GTE'a enpineerinq for such roarranyement, a deposit will be <br />requfnd. To inwn timsiy telsphona sarvics, GTE roquesfs ninery (90) days <br />Iwd tlrrN far a�pinNrinp, procuromsnt, and installatlon of cable and/ or GTE's <br />�� <br />PIM�� eontaet Didc Hayer, Senior En9inesr, at 358-4053 should you require <br />addUonal k�farmatlon. <br />The buildinpi ahould be desiyned to accommodat� the storaqe of recydable <br />materiala, bo�t in fhe� housinQ units and next to fhs rotuse disposal arosa for <br />centralized collectlon. <br />The owner should conaid�r settiny aside a small arsa of the sRe to compost <br />yatd and p�rden debris hom fhis projed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.