My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1804 121ST ST SE 2016-01-01 MF Import
>
Address Records
>
121ST ST SE
>
1804
>
1804 121ST ST SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2017 9:24:45 AM
Creation date
4/14/2017 10:36:16 PM
Metadata
Fields
Template:
Address Document
Street Name
121ST ST SE
Street Number
1804
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DETERMINATION OF NON••SIGNIFICANCE <br />SEPA 063-95 <br />����od�� <br />�u� o� �sa5 <br />..... . .................. .. ................_ <br />CITY OF EVERETi <br />put:ic V�brks Dept. <br />Tnis Final Determination of Non-S-,�ificance shall expire one yeai' <br />from date of issuance unless a cumpleted building permit applica- <br />tion has been submitt�d within that time. A request for a one <br />year extension of this Determination of Non-Significcnce may <br />be made to the Pianning Director prior to the expiration date. <br />DE3CflIPTION OF PflOPOSAL: The proposed action is the lssuance of permits to <br />alloW the placement of approximately 2,000 cubic yard: r" fill on an <br />approximat.ely .1j acre area, the area sho�rn on the sit� pl�� as "applicrtio❑ <br />for fill." <br />PflOPONENT: Bill Carhnrt <br />1804 - 121st SE <br />Everett, WA 9820u <br />LOCATION OF PAOPOSAL: 1804 - 121st SE <br />Lead a8ency: City oC Everett Planning Dept. <br />Contact Person: Mary Cunningnam <br />Mitigation Measures: <br />Phone: 259-8731 <br />The environmental Lmpaczs of this proposal are aocumented in the Environmental <br />Checklist and other information on file Nith the City. The listed <br />requirements are pla�ed in response to our ravieW cf this information: <br />MITICATION REqUZAED BY EXISTING CODGS S ORDINANCES <br />1. Detailed drainage calcuLations uill be required trom the applicant to <br />determine on-site detontion volume. In lieu of providing on-site <br />detention, payment to Clty Drainage Fund 340 is allowed per Ordinanee <br />670-80. The detention requirements fer this site will include the lost <br />volume of natural detention. The volume of natural detentlon must be <br />agreed upon prior tu parmit lssuance. (SEPA litilities Poli:y) <br />2. City streets are to be kept clear of dirt and debris at all times <br />during constructlon. Dust suppression and street cleaning mu.:t occur <br />as directed by Che Public Works Inspector per the City's Standards and <br />Specifications Manual (SEF':1 Earth Pollcies). <br />
The URL can be used to link to this page
Your browser does not support the video tag.