My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1818 121ST ST SE 2018-01-01 MF Import
>
Address Records
>
121ST ST SE
>
1818
>
1818 121ST ST SE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2018 1:50:38 PM
Creation date
4/14/2017 10:39:25 PM
Metadata
Fields
Template:
Address Document
Street Name
121ST ST SE
Street Number
1818
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
421
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�r���an� p <br />COST ESTIlSATE SHEET MAR 17 1994 � <br />��CITY OF EVERETT <br />Receipt A� Public Works Dept. <br />�_ Cost of Work Order $ 13.607.00 <br />PUBLIC WORKS DEPARTMENT <br />UTILITIES DZVISION <br />2300 CEDAR STREET <br />EVERETT, WASHINGTON 98201 <br />(206) 259-8800 <br />Date Paid <br />work order � <br />Cost of Service Order 5 Service Order ,� <br />Contact Person: Mark Mantei Teleohone #_339-5460 <br />Requested By: _ Gordon Witcher D�te of Request 3-14-94 <br />Property Uwner (na��e) _ Everett C>;��c <br />Charge Cost to (name if different than owner) <br />Address 3901 Hovt City verett Zip 96:?O1 <br />Installation Location 1818 - 121st St SE Silver Lake <br />Installation type/description/size/etc. Excavate 8" main wettap with <br />6". install 5f1� nf an nt ..,..., �..a ...... F:�_ �._�___� _. . � . _ <br />[X) The following estimate is based upon the Utilities Division <br />providing all labor, equipment, materials, restoration, and final <br />hook-up. <br />[ j The following estimate is based upon the Street Division work group <br />providing all labor, equipment, materials and restoration to <br />property. <br />Whenever the estimated coet is not suffictent to cover the total expenee for labor, <br />meterial, equipment rental and adminietrative ccsce, the deficit shell be charqed to <br />the property for which euch inetalletion was made end the owner thereof, end provided <br />further, that any excese payment ehall be returned to the pereon epplying for the <br />installation. <br />itemized Cost Eatimate: <br />ee�t�r7o)6eat <br />Labor & Overhead <br />Material <br />Equipment Rental <br />8.600.00 <br />Z.o5�.00 <br />2,030.00 <br />Surface Restoration 920.00 <br />Total 13� <br />Prepar?3 by John Ga za <br />Accepted by <br />cc: <br />Representing <br />Bldq. Permit Coun[er <br />Clair Olivere <br />Tom Thetford <br />Don Weitkamp <br />Kirk Brooke <br />Cordon Witcher <br />Dan Lowell <br />stan Mitchell <br />a..�..e oe/�e�n <br />
The URL can be used to link to this page
Your browser does not support the video tag.