Laserfiche WebLink
INSPECYION REPORT j� <br />Address �L ��/a3 �r���.� <br />Contractor E''lil�'�/�� <br />Owner <br />Date <br />7 PARTIAL APPROVAL <br />�0 VIOLATION 7 CORRECTION REQUESTED <br />] �orrectians lisied below MUST BE MADE belore work can be approved. <br />] Please contact inspector and arrenge foi appointment. <br />:] Was not able ro peAorm inspection. <br />J CALL 259•8810 FOR REINSPECTION – 2a hour not�ce reqwred <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br />ON THE PREMISES PI�IOR TO OCRUPANCY. , � <br />Inspecror <br />Elect. <br />Masonry <br />OF INSPECTION REOUESTED <br />Fr ing J Gas Pipina <br />I rywalf, Nailing J Consultat�on <br />J Shear Nailing J Groundwork <br />J Grid J Struct. Slab <br />J Rough-in J Final <br />, Service J Insulation <br />J Other <br />�BLDG: Pmt. No. ���— J MECH� Pmt. <br />> ELEC: PmL No. J PLBG: PmL No. <br />